Select Committee on the Crossrail Bill Minutes of Evidence


Examination of Witnesses (Questions 540 - 559)

  540. A filled green blob indicates 100 per cent step-free access; a half green blob indicates 50 per cent step-free access, and that was the problem discussed earlier—you can get to one side of the station but not cross the track; an empty red blob means that there is no step-free access to any of the platforms. As you can see today very few of these locations are accessible to people with restricted mobility who need step-free access.

  541. This is the slide you have seen before.[16] You can see from this one the effect that Crossrail will have on the ability of people who need step-free access to get to and from the locations on the diagram.

  542. One of the things I would like to add to what was said before was, with a half green blob one of the provisions in the Disability Discrimination Act is that of reasonable alternative provision; and at the moment on the national rail network the way that is effected is that an operator will provide a taxi for a disabled person if it is not reasonable for them to do that transfer up to the next accessible station and back again. They will provide a taxi back from the accessible station to the one on which they boarded originally.

  543. There are still a few locations where Crossrail does not provide step-free access. We believe that the negative effect on people with restricted mobility will be minimal because of the proximity of Crossrail stations where step-free access is being provided. This is exactly the issue we are dealing with today. Many of these stations provide interchange with other transport modes, such as the bus terminals at Ilford and Romford. Others provide better ticketing facilities, more staff assistance (which is important for disabled people), and generally because of their larger size and greater importance to the network better stations to use, and many people prefer to use them as evidenced by the greater passenger numbers passing through these locations, and Stratford would be one of those.

  544. Crossrail has looked at the nature of transport links to the stations from the surrounding area and is satisfied that, even now, there are sufficient bus routes to make the access straightforward. Given that Transport for London is one of Crossrail's owners and is also the body that regulates bus routes in London, we are satisfied that the picture will improve, if indeed it needs to improve, rather than deteriorate.

  545. Making a station accessible involves a number of thorny, practical issues, such as the available space—it may not be physically possible to incorporate a lift or ramp within the given space available.

  546. The level of use versus the expense in providing access, the business case, is also an important consideration, although it is not the only one.

  547. The Access for All programme, for example, takes such issues into consideration when it selects stations to upgrade. If you take something like Clapham Junction, which calls itself the busiest station in Britain, it is likely to cost £10 million plus. If you look at the Access for All funding, which is £365 million over ten years for 220 stations, that is a large proportion.

  548. Making a journey experience seamless for people with restricted mobility will have to involve working with partner organisations such as London Underground and Network Rail, and also a level of investment by them. Although it is still not clear at this stage how much partners will have achieved by the time Crossrail completes, much work has been done already looking at, for example, London Underground's existing interchange plans, and the proposed stations that are going to benefit from Access for All money.

  549. Crossrail is going to continue to take a proactive approach to engaging partners in its planning process. In addition, agreement has been reached that where changes are made to national rail stations at which Crossrail will call those changes will be delivered by Network Rail; and where changes are to London Underground interchanges those changes will be delivered by London Underground. That is an efficient way to achieve access, drawing on those partners' existing expertise. At Tottenham Court Road, Crossrail has worked with LUL to provide a station with fully accessible ticket halls, with accessible links to the Central and Northern Lines from street to platforms, and with interchange between all three lines. That is an example of good practice engagement between partners. At Paddington, as was mentioned earlier and as I, also, mentioned, there is passive provision for lifts being made where it is not currently possible to provide step-free access when Crossrail first opens.

  550. This is an example of a rebuild that will provide a significant improvement for people with restricted mobility, and it is at Ealing Broadway. These are just a couple of pictures I produce now.[17] As you can see, they are all of steps. Here is the artist's representation of what those two aspects of Ealing Broadway, as it currently is, will look like once Crossrail has finished with it.[18] Access has been a very long time coming at Ealing Broadway, and it is Crossrail that is going to make the difference.

  551. I did mention at the beginning that Crossrail recognises that accessibility is not just about wheelchair users, walking difficulties and step-free access. However, today's issue, because of the design stage, is essentially about step-free access. The fundamentals of the infrastructure, such as straightforward layout, which is only possible in a brand new build, and that assists many disabled people but, particularly, those with learning difficulties, and step-free access, need to be designed in from the outset, and Crossrail has focused on that so far. Now that the design is maturing and developing, Crossrail is going to be looking at other fixtures important to access, which are things like seating, and eventually it is going to be looking at, for example, colour and materials, which are of particular interest to people with visual impairments.

  552. Towards the end of the project, as the provision of information including signage is considered, the needs of people with sensory impairments and learning difficulties will become paramount. Crossrail's programme of involvement and consultation is going to be key throughout the project to engage the right people at the right time to provide good advice where there are no standards or accepted good practice. Indeed, Crossrail is going to be contributing to developing those good practice standards for as long as it operates at the cutting edge of design for disabled people in the transport environment.

  553. Finally, I would just like to say that access is not just about the hard stuff. When Crossrail opens, good management of both the station infrastructure and vehicles will be crucial in providing an accessible service, as is training, effective co-ordination with interfacing operators, journey planning and assistance, and as the specification for Crossrail's operation is developed this must be borne in mind. Thank you.

  554. MS LIEVEN: My Lord, Dr Maynard is happy to answer questions. I do not know whether Mr Reed has questions for her.

  555. LORD JAMES OF BLACKHEATH: No reference has been made to the close proximity of three major football grounds within the area of these stations, and I am concerned as to what the impact might be of anybody in a handicapped situation trying to travel while there were hordes of rather robust football supporters trying to gain access or travel on the same trains. Has any thought been given to that and what protection might be afforded, and whether the stations themselves are in any way likely to be vulnerable to having made football rioting easier because it has opened out the space for fighting?

  556. MS LIEVEN: My Lord, I do not know whether Dr Maynard is that familiar with the area of these particular stations. It may be that Mr Berryman will be better placed to answer those questions.

  557. LORD JAMES OF BLACKHEATH: I would be very concerned to know the answer to this because I have had some experience of rioting to be controlled and I know that it is a near-impossible situation, and that they will take any opportunity for an open space to get stuck into each other. I am just wondering whether we have created a situation here where we have created natural battlegrounds.

  558. MS LIEVEN: My Lord, I am not trying to avoid the question, I just suspect that Mr Berryman would be the better person to answer it.

  559. LORD JAMES OF BLACKHEATH: I would like the question noted for future reference.



16   Crossrail Ref: P8, Crossrail Line 1-Diagram 2-step-free access to Crossrail stopping platforms (LINEWD-XR4-012) Back

17   Crossrail Ref: P8, An example: Ealing Broadway (LINEWD-XR4-014) Back

18   Crossrail Ref: P8, Ealing Broadway as it will be (LINEWD-XR4-015) Back


 