  620. Yes but the intent was nevertheless to provide full accessibility at each of the stations, was it not?

   (Dr Maynard) Actually I think probably by that stage the intent was not to provide access at Sheffield mainline station?

  621. Is that something you would agree with or not?

   (Dr Maynard) No actually, it is not something I would agree with.

  622. Thank you. Let us carry on in that case to paragraph 3.1 of the document which you will find as an extract at page 23, under "Improved access to transport facilities": "Government research recognises that transport can be a significant barrier to social inclusion. People may be restricted in their use of transport by low income, the absence of routes to desired destinations, or because facilities are inadequate or difficult to use. Age, disability and low income can prevent people travelling by car, making them reliant upon public transport. In turn, these can restrict or prevent access to employer opportunities and key services such as schools, hospitals, shops and leisure facilities."[24] Can I ask you this, Dr Maynard, in terms of those various categories of person who find difficulty in accessing particular locations; they are those who firstly are on a low income, secondly disabled and thirdly old age?

  (Dr Maynard) Sorry, was there some kind of priority order?

  623. No, there was no priority order; I am simply reading what is said midway through that first paragraph.

   (Dr Maynard) Yes, that is correct.

  624. And if particular people who want to access the transport system have more than one of those particular characteristics then that is a cumulative problem that they would face, for example low income and disabled?

   (Dr Maynard) Indeed, and indeed many disabled people are in the low income category.

  625. And in terms of understanding the significance of that particular issue in the context of whether one should upgrade particular stations, one should look to the levels of deprivation within and around that particular station; is that fair?

   (Dr Maynard) Yes, one needs to look at the levels of deprivation in that area and the level of transport provision in that area.

  626. MR REED: And can I ask you please to turn over the page to page 25, figure 3.1, it is in black and white but it is capable of being read, is it not, in that the grey areas that one can see on that plan show areas of deprivation, that is to say the 20 per cent most deprived in the index of multiple deprivation?[25]

  627. BARNONESS FOOKES: It is pink.

  628. MR REED: You have coloured versions, my Lady. I do not and I am at a disadvantage in that case. Thankfully I can read it but in any event what it is showing, is it not, is that in respect of Newham and the stations that pass through Newham it is identified as being a significantly deprived area?
  (Dr Maynard) Yes it is.

  629. And this document recognises the importance of deprivation indices and the accessibility or the reduction of stations within such deprived areas, does it not?
  (Dr Maynard) Yes it does.

  630. MR REED: And the result of taking into account that factor comes to this, does it not, if you turn to page 28 in the document—

  631. LORD YOUNG OF NORWOOD: Is that the last page in our bundle? After 25 they are not numbered.

  632. CHAIRMAN: They are—at the top left-hand corner.

  633. MR REED: My Lord, at 3.1.3 under "Access for people with restricted mobility", as I say, it comes to this, does not it that the position of Crossrail in January 2006 was: "One of the most significant benefits relates to access to new services through the provision of step-free facilities improving access to the West End, City and the Isle of Dogs. The Crossrail project aims to minimise any undue effort by, or special treatment of, passengers with restricted mobility. Where new platforms are used exclusively by Crossrail trains, Crossrail will cater for people of restricted mobility (PRM) by providing independent, step-free access from street level to platform. Existing stations served by Crossrail will be refurbished to cater for PRM wherever it is reasonably practicable to do so. Where step-free access is not available, dignified, alternative arrangements or auxiliary aids will be employed."[26] So the approach to be taken towards existing stations is that wherever reasonably practicable there would be an upgrading of those stations?

  (Dr Maynard) Absolutely.

  634. Yes. Can I ask you please just to turn to the extract from the First Special Report of the House of Commons 2006-07 and Volume I in particular. It should be a three-page extract and I hope you have a copy of that. Page 17 is the first page after the frontispiece.[27] To understand this, are you aware of the fact that the London Borough of Havering appeared in Committee and highlighted their concerns? Are you aware of any of that detail?

  (Dr Maynard) I am not aware of the detail of it; I am aware that it happened.

  635. The report says this, does it not, that Havering "appeared in Committee to highlight their concern that the planned Crossrail works at Romford Station did not provide adequate facilities for mobility impaired people. The Promoter, at the request of the Committee, worked with the London Borough and explored the possibility of: a) building a southern entrance through the existing station structure; b) widening of the existing mezzanine passageway; and c) how the design of the station foyer and treatment of the area beneath the railway bridge could improve access to the station from the south." I do not want to go into the detail of that, you will be pleased to know. I just want you to look at paragraph 54 which says: "The Committee invited the Promoter to find a way to provide appropriate access for mobility-impaired people to the developed station in the location of the current ramp. We re-emphasise the need for implementing disability-friendly policies and we remain grateful to the London Borough of Havering and Crossrail for the re-design of the station to ensure that passengers can access the building readily. We expect the same level of regard to be shown in providing access for those with disabilities across the entire breadth of the Crossrail operations." Is it fair in terms of understanding the approach of the Committee there to take this conclusion from what is said: that there is a requirement on the part of Crossrail to have the equivalent level of regard to that which they had in respect of Havering's petitions?

   (Dr Maynard) Yes, that is what they say. They say they expect the same level of regard.

  636. Tell me, in terms of the approach that Crossrail have now taken towards other stations, has there been any positive response as a result of that indication?

   (Dr Maynard) From Crossrail?

  637. Yes, that you know of?

   (Dr Maynard) Crossrail is continually trying to ensure that in all aspects of the work that it does it provides a high level of regard for disabled people in relation to access.

  638. And to the extent that they have decided not to proceed with accessibility works at particular stations, would that be having that level of regard as is identified by the Committee at paragraph 54?

   (Dr Maynard) Yes, I think they are compatible because it depends on the environment in which the particular station is; it depends on the nature of transport provision in the local area; it depends on a whole raft of things and you can have the same level of regard. It is not conflicting to have the same level of regard to do one thing in one place and one thing in another and it is much like I was talking about earlier about equal treatment not necessarily achieving an equal outcome. In this case you can have different treatment that achieves different outcomes because actually the circumstances are different and the environment is different so it would actually depend on the detail.

  639. Tell me, in so far as there was there an indication that there should be provision for access for those with disabilities over the entire breadth of the Crossrail operations, is that met by not providing any accessibility at two of the stations within Newham Borough?
  (Dr Maynard) I am sorry, I thought we were doing the generic stuff now but I will carry on. I thought that the nature of the alternative transport arrangements and the accessibility to the other stations in Newham Borough is such that it could be considered to be the same level of regard. What you would need to know in order to be able to make that judgment is what the provision was in the local area for Romford and how close by the nearest accessible station to Romford was and what the issues were. For example, one of the things that I mentioned in my presentation was about the bus station at Romford and, therefore, Romford is quite an important transport hub, if you like, transport interchange between bus and rail, whereas, to the best of my knowledge and belief, neither of the two stations that we are talking about in Newham is a transport interchange hub.



24   Department for Transport, Crossrail Equality Impact and Assessment, January 2006, p23 (SCN-20080226-005) Back

25   Department for Transport, Crossrail Equality Impact and Assessment, January 2006, Figure 3.1 (SCN-20080226-006) Back

26   Department for Transport, Crossrail Equality Impact and Assessment, January 2006, p28 (SCN-20080226-007) Back

27   House of Commons Select Committee on the Crossrail Bill, First Special Report Session 2006-07, Crossrail Bill, HC 235, paras 53 to 54 (SCN-20080226-008 to -009) Back


 
previous page contents next page

House of Lords home page Parliament home page House of Commons home page search page enquiries index

© Parliamentary copyright 2008