Select Committee on the Crossrail Bill Minutes of Evidence


Examination of Witnesses (Questions 3280 - 3299)

  3280. MR MOULD: The next question is on a point raised and I think this really was the burden of Mr Wheeler's argument to the Committee today, and that was can you give an explanation of what motivated the choice of route alignment through the Spittalfields area please?
  (Mr Berryman) Yes I can. The alignment of Liverpool Street Station, which is here (indicating) is effectively fixed by the presence of the existing mainline station and the number of tall piled buildings in the area.[31] The alignment of Whitechapel Station likewise is fixed by the availability of open space from which to construct the station, which I showed your Lordships when we went down there, in this location here (indicating). On any alignment the first requirement is that it must connect (indicating) this alignment here with this alignment here (indicating). What we also need to do is to avoid piled buildings, as I think Counsel has mentioned several times before. There are issues about settlement but there is also the high risk of a tunnel-boring machine touching or colliding with the pile on the building if you do not know where they are. The general rule in London, I am sorry to say, is that we have very poor records of how deep the piles are in existing buildings.

  3281. CHAIRMAN: Or where they are.
  (Mr Berryman) We are not too bad on where they are, my Lord, but the depth is always a problem. Contractors, as I think you are aware, are supposed to produce as-built drawings when they finish the construction of a building. Unfortunately, piling contractors appear to be less assiduous than perhaps they could be in that matter. There is always a risk with piled buildings that we will not quite know where the piles are and as a result we have tried to avoid them wherever possible. That is the first criterion. The second criterion is to keep within the Crossrail alignment standards which is related to gradient and sharpness of curve and so on. That is for the purpose of building a railway that can operate at the design speed with satisfactory passenger comfort and with minimum maintenance consistent with that. The final thing that we have to do is to locate sites or potential sites where a shaft can be positioned. As I think has been explained already, we need to provide shafts for intervention by the Fire Brigade and other emergency services and for purposes of ventilation.

  3282. This is a requirement of HM Railway Inspectorate, is it not?
  (Mr Berryman) It is, Sir, so the alignment here was fixed bearing those things in mind. Whatever we did we knew that we had to have a kind of S-shaped curve. We investigated a number of potential sites for shafts, as I think has already been explained, and none of them was very good. I would not like to pretend that the site we chose is brilliant but it is the least bad of all the ones we looked at and so we knew the alignment had to go through here and we wanted to avoid the large number of piled buildings here. That is why this alignment was selected. The initial decision on tunnelling strategy to put in a temporary adder here and tunnel in here (indicating) was taken much later, at least a year after this alignment had been selected, so the remarks made by Mr Wheeler earlier that this shaft site had been selected to facilitate the tunnel programme is actually not true, although, to be fair to him, he would have no way of knowing that because he was not there at the time.

  3283. MR MOULD: Just following the logic of that point, he said that the fact that under the revised strategy it was no longer necessary to use the Hanbury Street shaft for the sinking of the tunnel-boring machine and the Pedley Street exit was no longer required as part of the revised scheme—his suggestion was there is a clear link between that and the continuing need to drive the tunnels through the Hanbury Street area. What do you want to say about that?
  (Mr Berryman) The absence of the need for that link and the absence of the use of this site as a tunnelling site obviously means the works here can be much more modest than they previously would have been, but as things stand at the moment we still need to provide the intervention and ventilation shaft and this is still the best site in the area, although I would be the first to admit it is not perfect.

  3284. Does that revised tunnelling strategy significantly affect the route alignment?
  (Mr Berryman) It has no bearing on that really.

  3285. Thank you. I want to turn to another point. Mr Wheeler has expressed a number of concerns about the assessment of listed buildings within the Spitalfields area that are potentially subject to ground movement during the construction of the Crossrail running tunnels. You heard him talk about that?
  (Mr Berryman) Indeed.

  3286. I have asked to be put up one of the assessment reports that he referred to and criticised during the course of his presentation this morning.[32] The first question I want to ask you is this: as he pointed out, the heritage aspects of these reports were prepared by Alan Baxter Associates. Can you please explain the role Alan Baxter Associates have had within the project and in the settlement assessment process?

  (Mr Berryman) Well, the first thing I should say, my Lord, is that Alan Baxter, as I think the Petitioner mentioned, is very highly regarded in the conservation community. He is a member of the Advisory Panel of English Heritage and he is, I think, in terms of structural engineering probably the doyen of experts in that matter. He advised us on the robustness or the historical aspects of the buildings and helped us in formulating our policy on how we dealt with the issue of tunnels passing underneath historic buildings. I am sure members of the Committee will realise that these are not the only historic buildings under which we pass in London. There are quite a number in other areas of London.

  3287. Was it open to Mr Baxter in principle to express his views about the adequacy of the assessment method that the project proposed in order to assess the potential impact of the scheme upon historic buildings under which the route passed?
  (Mr Berryman) Yes, my Lords. Alan Baxter is a man of quite strong opinions and where he feels that we have not given him a wide enough brief or he should be doing more than we have asked him to, he has had no hesitation in coming forward and telling me, and he has never done so in connection with the Spitalfields area.

  3288. And as has been made clear, the historic buildings and features reports, of which this is an example, were prepared by his firm, as I understand it?
  (Mr Berryman) That is correct, yes.

  MR MOULD: Just turning from Mr Baxter to the role of English Heritage, can you just give the Committee a little bit of background ---

  3289. CHAIRMAN: Just before you leave that, was it Mr Baxter who produced the predicted strains where they are given, which is most unusual?
  (Mr Berryman) No, my Lord, that would be Mott MacDonald who would have produced that. That is a matter of mathematical calculation of course.

  3290. Yes I notice that.
  (Mr Berryman) I am not suggesting, my Lord, that Alan Baxter cannot do mathematical calculations; quite the contrary.

  3291. No, but it is not his primary role.
  (Mr Berryman) Absolutely. The role of English Heritage is that English Heritage are of course the statutory consultee in the process of preparing this Bill and the approach to `Assessment of Settlement Impacts on the Built Heritage', which is one of our baseline documents, one of the documents on which the whole process is based, was agreed with them. They were heavily consulted on it and it was an agreed text with them. That is what sets the framework for how the assessments should be done and the approach that should be taken. As I say, they agreed that process with us as to what was the appropriate way to do it and we have consulted them all the way through on matters of concern where such have arisen.

  3292. MR MOULD: Just turning then to where reports, of which this is an example (that is to say if we look at the top left-hand corner "Listed Building Assessments, Phase 3 Iteration 1 Reports") fit into the overall settlement assessment procedure which the project has embarked upon, Mr Berryman, can you help the Committee with that?
  (Mr Berryman) Yes I think your Lordships will remember that Professor Mair gave an outline of this iteration at stage one, two and three—iteration one, two and three in the process—but basically all the properties inside the 10 mm contour settlement are subject to a Phase 1 assessment, irrespective of their age or any other features. Anything which comes up as more than negligible damage will be subject to a Phase 2 assessment and anything that goes beyond that, and all listed buildings, irrespective of where they come in the spectrum, will be treated to a Phase 3 assessment. Phase 3 in itself has got three iterations. In the first iteration is an individual building assessment and we calculate the maximum tensile stress. Again, Professor Mair referred to that in his presentation and explained the significance of that, I think better than I could. Then iteration 2 is taken forward if the building scores more than a certain amount in the scoring system that we have developed and then iteration 3 would occur if advanced numerical analysis was needed if we thought there was a really big issue. So the process here is that most of these buildings, in fact all of these buildings which are listed, have been taken to the Phase 3 analysis and all of them through iteration one. Further work will be done when the contractor is appointed.

  3293. CHAIRMAN: Where does the interior come in this whole process, the features of the interior?
  (Mr Berryman) The owners of these buildings will all be entitled to a Settlement Deed, which will include a requirement to survey the interior of the building in some detail for the purpose of detecting existing defects in the building, and assessing whether there is anything specific that needs to be done to that building during the process of the works. Of course, once the contractor is appointed and the details of his machines and so on are known then further assessments will be done before tunnelling actually comes through. I think it is worth saying in this case, because as I mentioned earlier we are near the end of a tunnel drive, by the time we get to these locations we will have very good empirical evidence of how the machine is performing and what kind of settlement we are experiencing with the actual construction.

  3294. LORD SNAPE: Further to your question, my Lord Chairman, if you do not look at the interior now surely that impacts on the score sheet, as we have heard from the previous witnesses, as to which category these buildings are put in?
  (Mr Berryman) I do not think it necessarily does, and I am not sure even if it does that it is that significant, my Lord. We will be assessing them again before tunnelling is actually done and that will include an internal inspection as part of the Settlement Deed.

  3295. You see the point I am seeking to make. The fact is that you categorise these properties one, two and three and presumably, having not inspected the interior, that has impacted upon the category in which each building finds itself?
  (Mr Berryman) It may do in some cases.

  3296. Do you think that is satisfactory, or can you see an alternative?
  (Mr Berryman) At this stage of the process I think it is satisfactory. As you said quite correctly, my Lord, it will need to be looked at again before the tunnelling is actually done, but I think it has been made clear in any event that we will be doing that.

  3297. BARONESS FOOKES: You indicated that there will be an internal survey for all listed buildings automatically?
  (Mr Berryman) Yes, my Lady; not only for all listed buildings but for all buildings actually.

  3298. That was going to be my next point, and you have answered it.
  (Mr Berryman) The process here is that before the tunnelling comes through a survey will be carried out by a surveyor, jointly instructed by us and the building owner, and I am talking in the generality here and not particularly about listed buildings, so that if there is any damage due to settlement (and we confidently expect there will not be any) we would have an accurate assessment of what had been caused by the settlement as the machine went through.

  3299. It is quite likely, is it not, that there will be existing defects which may or may not be affected by substance but which a detailed survey will throw up?
  (Mr Berryman) It is perfectly possible.



31   Crossrail Ref: P23, Liverpool Street Station to Whitechapel Station (TOWHLB-XR5B-040) Back

32   Committee Ref: A19, 17-25 Wilkes Street, Listed Building Assessments, General Description, Mott MacDonald (TOWHLB-20_05-011) Back


 