Select Committee on the Crossrail Bill Minutes of Evidence


Examination of Witnesses (Questions 3520 - 3539)

  3520. Can I ask then for you to talk in a bit more detail about these scores? If a building scores 2, how does your treatment of it thereafter vary or differ from if the building had scored 3?
  (Mr Berryman) I do not have the chart in front of me, but the higher the score, the more intensive the modelling and the analysis which is carried out to check the stability and adequacy of the building for the settlement which is going underneath it. Generally speaking, you start at the lowest level where there is the lowest risk and you do an analysis of what we call the greenfield settlement. If that is okay, you do not go any further, unless there is some particular reason for doing so. If it is not okay, you go to the next stage and do a more detailed analysis, rising to the highest stage where you would do detailed finite elements analysis using very sophisticated computer programmes and very extensive analysis. The score just determines the amount of work that is put in on that particular property.

  3521. There are only three scores I think, it is either 1, 2 or 3.
  (Mr Berryman) You are talking about Phase 3 now, are you not?

  3522. Yes, that is all we have done so far.
  (Mr Berryman) Well, in fact there are two phases before Phase 3, as you are aware. It is just that listed buildings go straight to Phase 3.

  3523. That is what we are talking about, listed buildings. There seems to be three scores available, 1, 2 or 3, and what we are not clear, we are putting a lot of effort into asking to inspect them and certainly because we believe that will lift their scores, as has been demonstrated, but we are not quite sure what follows on from that, what have we achieved, so I wonder whether you could explain what is the difference between 1, 2 and 3? What does it mean?
  (Mr Berryman) It means that more detailed and more intrusive—

  3524. No, specifically, if you score 3, how does that affect the Promoter's response or how does that affect the Promoter's dealings with that building thereafter? I cannot get to the point of these scores.
  (Mr Berryman) If you score 3, you do a very detailed analysis of possible movements within the building, assess in detail what the impacts might be on that building. We would still expect that most of the buildings that scored 3 would still fall into the negligible or very slight category of damage, but we would have to make sure that our analysis was comprehensive, thorough and included all the issues. If it was found that there were some problems, then we may have to go to some strengthening or some remedial work before the tunnelling came through but, as I think you know, there is nothing on the route which falls into that category.

  3525. What happens if it scores 2?
  (Mr Berryman) If it scores 2, we do an intermediate level of analysis on the building to make sure that our original assumptions are correct. We take into account the stiffness of the building itself as well as the ground movements which are relevant in determining how the building reacts. I think Professor Mair can fill you in on that better tomorrow morning.

  3526. When does this very detailed analysis that you referred to in score 3 happen?
  (Mr Berryman) It would happen in sufficient time before the tunnel boring machines came through, to ensure that if any remedial work or strengthening work was needed it could be done. I would have thought twelve months or so before would be about the right time.

  3527. Twelve months. You mentioned that the tunnels are going through between 2012 and 2014.
  (Mr Berryman) Yes. The back end of 2012 at the earliest.

  3528. So these final surveys, which you do—if you have a score of 3 you qualify but you do not qualify if you have only got a score of 2—they are done a year before the tunnels come through. Is that a different procedure to the condition surveys that you would do on all the buildings?
  (Mr Berryman) Normally, we would try and do the condition surveys at a reasonable period before the machines come through, for the obvious reason that buildings can deteriorate in the period between our inspection and the tunnel-boring coming through. So we need to be about a year in advance of the machines coming through.

  3529. MR WHEELER: So the condition surveys get done pretty much the same time as your historic building surveys. I am struggling to see the difference between how you treat one category of building and another. It seems, essentially, they are all going to be surveyed one day—rather too late.

  3530. CHAIRMAN: I think we are at cross purposes. I think that the surveys that will be done in advance take two forms: will one of them not be a predictive engineering survey about what is likely to be the effect on a particular building of the tunnelling process, and the other sort of survey is what the building is like now?
  (Mr Berryman) That is correct.

  3531. MR WHEELER: Yes, that is true.

  3532. CHAIRMAN: Is that right?

  3533. MR WHEELER: That is just what I mean. The point is it seems as though both those surveys are going to be done at exactly the same time. If this further survey for the buildings that score 3 is done a year in advance of the tunnels coming through, and what Mr Berryman is also saying is that the condition surveys will be done at exactly the same time, what I am wondering is how a building that scores 3 is treated any differently to a building that scores 2.
  (Mr Berryman) If a building has scored 3, further analysis will be done on the actual tunnelling process and on the machine that, by that time, we have already bought. The detailed analysis of the movement of the building will be carried out at that stage, and if any temporary propping or things of that sort (actually, we do not anticipate anything like that will be necessary) we would arrange for it to be done at that time, possibly the works being done a few weeks before the tunnel-boring machines come through.

  3534. I understand that. The next question I have concerns a map we saw right at the beginning of the piece this morning, concerning the boreholes.[41] Do we have that map available? Thank you. Can I ask what these boreholes are investigating?

  (Mr Berryman) They are investigating the soil strata beneath the ground.

  3535. Why do they so conclusively avoid where the tunnels are going?
  (Mr Berryman) The boreholes in this area were carried out in the 1992 scheme. This is the only one we have done so far down here. Crossrail is not a popular project in this area. We have had great difficulty—

  3536. CHAIRMAN: You do surprise me, Mr Berryman!

  3537. LORD YOUNG OF NORWOOD GREEN: "How would you like a borehole in your garden?" does not go down well!
  (Mr Berryman) Absolutely. We have had great difficulty in arranging for building owners to give us access. Of course, when we have the powers which the Bill gives us we will be able to do that much more conveniently.

  3538. MR WHEELER: You should have been around when Clancy Docwra have been digging up the whole area. There are plenty of opportunities for boreholes.
  (Mr Berryman) Regrettably, their boreholes are not deep enough for our purposes.

  3539. I see what you mean, because that is why the boreholes carry on up north, is it not, because it is following the original safeguarded route. Then you do not show any proposed boreholes either following the actual route. I think we have spoken about the variable ground conditions and what have you in this area. It is alarming that the boreholes you are relying on are actually not for the routes that you are pursuing. Are you not going to be taking greater care to put a few boreholes down along the route you are actually excavating?
  (Mr Berryman) I do not know who has given you the idea that the ground in this area is not consistent in its stratification. Nothing could be further from the truth; this is quite a straightforward area to map. The geology here is straightforward.



41   Crossrail Ref: P23, 10mm settlement contours and boreholes-Spitalfields area (TOWHLB-XR5A-094) Back


 
previous page contents next page

House of Lords home page Parliament home page House of Commons home page search page enquiries index

© Parliamentary copyright 2008