  4240. LORD YOUNG OF NORWOOD GREEN: You said that the figures you arrived at for strain at 0.024 were a conservative assessment. It makes me think that you measured it and you came up with a figure that said 0.012 and you thought, "Right, we are going to be really safe on here so we will double it." How do you arrive at that description "conservative assessment"? How did you make that allowance?
  (Professor Mair) I think I can explain that.[40] The assessment methodology that arrives at that calculated tensile strain starts with an assumption about the volume loss that the tunnel itself causes, which is another way of saying how much settlement is the process of the tunnel construction actually causing? That assumption for this whole exercise has been 1.7 per cent for the volume loss. That is the conservatism; in other words, that is a very safe assumption in that all of the experience from the Jubilee Line Extension and from the Channel Tunnel Rail Link tunnelling has been that the kind of tunnelling technique that will be used for Crossrail is most unlikely to cause volume losses greater than one per cent and probably more like 0.5 per cent.

  4241. LORD YOUNG OF NORWOOD GREEN: Is volume loss earth displaced that creates the void? Can you explain that bit?

   (Professor Mair) Volume loss is soil displaced; it is, if you like, during the actual act of creating the tunnel the ground is moving towards and into the tunnel. If you had zero volume loss—it is the Holy Grail for tunnelling—it would mean that you actually created the tunnel without causing any movement of the ground around it. Ten or 20 years ago volume losses were two per cent, sometimes even three per cent. Nowadays with the technique of closed face pressurised tunnelling, which will be used on Crossrail, the volume losses are much smaller and you can see on the slide shown now the earth pressure balance machine for the Channel Tunnel Rail Link and for the Jubilee Line Extension and for the recent DLR Woolwich Extension are between 0.5 and 1 per cent. Those are the observed measured volume losses. Just to remind us, the assessment that Crossrail has used in the Environmental Statement for all of these building damage assessments has been 1.7 per cent and it is directly proportionate. So if the volume loss is in fact only 0.5 per cent it will mean that the actual settlement and the actual strain the building will experience will be less than a third of that calculated in the assessment process, and that is the meaning of the word "conservative".

  4242. LORD YOUNG OF NORWOOD GREEN: Thank you, that was very informative.

  4243. CHAIRMAN: Some lay people like myself talk about ground movement; it is the same thing, is it?

   (Professor Mair) It is exactly the same thing, my Lord. We use volume loss as a rather tunnelling orientated way of describing ground movement.

  4244. BARONESS FOOKES: Could I briefly raise a related matter? I think it was Mr Berryman who said that London Clay was inclined to move anyway, so that all these buildings which have been up for a very long time would have been subject to movements which might have been greater than would be caused by the tunnel building. I hope I have it right but could you comment on it?

   (Professor Mair) Yes, you do have it right. What Mr Berryman was saying is exactly right. There are two points to make here. One is that seasonally there is a surprising amount of movement of buildings on ground such as London Clay. In other words, a hot summer, if we have such things, where it does not rain very much it is well known that buildings on ground such as London Clay can rise certainly by 10 mm. Correspondingly, when the wet winter arrives they can settle again of that order. So there is quite as lot of seasonal movement of buildings, and of course if buildings are old, such as the Georgian buildings in the Spitalfields area, there is a remarkable amount of settlement of the buildings due to the foundations perhaps not being as robust as modern foundations, and one can see that by simply walking around the city; one can see evidence of movement of buildings. But the seasonal movement is an important and regular occurrence. Then there is another point, that since about 1800 there has been very substantial industrial pumping from the deep aqua flow, from the chalk, to extract water, and this had been going on—it is now not happening as much—and for about 100 years and possibly longer than that London settled by a very substantial amount, by about 200 mm—by about eight inches—simply because water was being extracted in large amounts from the chalk deep down, and it is a very well known phenomenon that if you pump water out from the ground the ground will settle. So Keith Berryman's point about buildings having experienced movement is absolutely right on two counts. Firstly, seasonal movement, which makes buildings go up and down by around about 10 mm quite happily, and sometimes more; secondly, that the whole of London has experienced very large movements, and I must point out that that large movement caused little or no distress. So London settled by 200 mm without the buildings experiencing damage, mainly because that was a very uniform effect—it just all went down uniformly.

  4245. BARONESS FOOKES: Do you have to take the seasonal movement into account with the tunnelling or is it negligible?

   (Professor Mair) We do not explicitly take it into account but in a sense we are allowing for it in that you will recall that in the Phase 1, Phase 2, Phase 3 process I have described we eliminate all buildings which are outside the 10 mm contour, and one of the reasons we do that is that 10 mm is within the normal movement seasonally. So, in a sense, we are taking account of the fact that buildings rise and fall by about that sort of quantity seasonally. So in that sense it is taken into account.

  4246. CHAIRMAN: Did you get it right that clay swells when it is wet and contracts when it is dry?

   (Professor Mair) Did I say it the other way round?

  4247. CHAIRMAN: I think you said it the other way around.

   (Professor Mair) You have corrected me, that during the summer there will be a settlement. I am so sorry, I confused everybody including myself and I apologise.

  4248. MR MOULD: My Lord, unless there are any other questions?

  4249. CHAIRMAN: Mr Wheeler is not here?

  4250. MR MOULD: No.

  4251. CHAIRMAN: He is the Parliamentary Agent for a number of Petitioners, including Selena Mifsud and a whole list of others. Is there anybody from that group who wants to ask questions? It is Petition 20. Is anybody here who wants to ask questions of Professor Mair, because I do not know that there is going to be another opportunity. No.

  4252. LORD YOUNG OF NORWOOD GREEN: My Lord, if I could have the opportunity, as I have not had the opportunity of benefiting from your tutorials before? I have been looking through the ground settlement information paper; are you familiar with that?

   (Professor Mair) Yes, I am.

  4253. In terms of a process and a methodology how would you rate that?

   (Professor Mair) I would rate it very highly, but I would, would I not? Quite a lot of it is based on my work. I can say that it is adopted in many parts of the world; this process is currently being used in Singapore, in Hong Kong, in many other countries.

  4254. Would I be right in saying that this incorporates best practice?

   (Professor Mair) You would certainly be right, yes.

  4255. MR MOULD: Perhaps another way of putting it, if we turn to page 10 we see that although, as Professor Mair has just pointed out, he is one of those who is listed under the references section of this paper, he is in the company of others and, Professor Mair, no doubt those names are familiar to you?[41]

  (Professor Mair) Yes, they are; certainly my colleague, Professor Burland, who is now an Emeritus Professor of Imperial College has had a great deal to do with this assessment methodology as well.

  4256. So it is fair that the methodology, the process which you set out in this information paper is one that has been informed not only by your own work but also by the work of your peers around the world?

   (Professor Mair) Yes, that is correct.

Spitalfields—Noise Issues

  4257. MR MOULD: My Lord, I am conscious that I have an outstanding request from my Lady. I am in your hands. We shall be making some short closing submissions about this and I would be very happy at that stage just to summarise what happens hereafter, as it were, in relation to the continuing assessment of listed buildings. Alternatively, I can touch on that now. I am conscious of the fact that we have Mr Thornely-Taylor here.

  4258. CHAIRMAN: I have been seeing Mr Thornely-Taylor sitting patiently at the back of the room.

  4259. BARONESS FOOKES: So long as it is dealt with at some stage I am quite happy for the timing to be left to you.



40   Crossrail Ref: P6, Summary of Volume Loss Experience (LINEWD-RJM01-038) Back

41   Crossrail Information Paper D12-Ground Settlement, http://billdocuments.crossrail.co.uk (LINEWD-IPD12-010) Back


 