  8260. MR ELVIN: It would.

  8261. CHAIRMAN: In order to meet most of this Petition additional provisions would be needed and we cannot do it.

  8262. MR ELVIN: Indeed my Lord, and indeed they were requests which were rejected also at the Commons stage when additional provisions could have been required. I appreciate your Lordships may take a different view on that but your Lordship is right.

  8263. CHAIRMAN: Mr Francis, could you make a little progress before we break for lunch?

  8264. MR FRANCIS: Certainly, my Lord. My name is Alan Francis and I am the transport speaker for the Green Party and I am here today representing Jean Lambert, who is the MEP for London, and Darren Johnson and Jenny Jones, who are Members of the London Assembly. I have supplied the Promoters and the Clerks with a copy of what I propose to talk about today and this is basically a plain English version of the issues which are raised in the Petition, along with the reasons for raising them and also some responses to the Promoters' responses in their letter of 31 March. I do not propose to read this out but merely to highlight some of the points made and then to move on to the cross-examination. I certainly would like to cross-examine Mr Berryman. I do not have any witnesses of my own. It would also be useful to use some of the slides which Mr Berryman showed earlier this morning, so if they could be available it would be helpful, and I have one or two slides of my own to show as well.

  8265. CHAIRMAN: We have got what is called the evidence in support of your Petition. Would you like to highlight the matters in it that you wish us to pay particular attention to?

  8266. MR FRANCIS: That is what I was about to move on to.

  8267. CHAIRMAN: That would be very helpful.

  8268. MR FRANCIS: Our main points of concern are the capacity on the Great Western Main Line, the western branches—and I have heard what has been said about your remit and how far you are able to go on that one—and the layout proposed for Custom House Station in south-east London. We do still have some concerns about the access options. Having heard this morning's discussion, I think I will just leave it to the train operating companies and the freight operating companies to pursue that but simply say that I think it is essential that there should be sufficient paths for freight and passenger trains, particularly on the Great Western Main Line, and not just those that are running today but those that are included in growth forecasts over the next ten to 20 years, because we are expecting to see both the number of freight and passenger trains increase considerably over that period.

  8269. I will move on to the beginning of what I said in the evidence, and that is the capacity issue. Mr Berryman, in one of his slides, showed you graphs which showed the difficulty of timetabling trains on the slow or relief tracks, as they are called. Of course, what you saw on those graphs was that the lines must not cross because that would be one train on top of another, because you only have one track in each direction. What we think is that we need extra tracks, probably between Slough and the Royal Oak portal, so you have five or six tracks in total rather than just the four that are there today. What that does is to allow one train to overtake another in the same direction, which you do not have the capability of. That, essentially, allows those lines on the graph to cross.

  8270. Where you have a mixture of speeds of trains, as Mr Berryman highlighted, it is very important that, for example, a semi-fast passenger train—be that on of the regional trains from Reading or one of the Crossrail trains which does not serve all stations—should be able to overtake either a freight train, perhaps, or one of the Crossrail trains which does serve all stations. If you do not have that ability, and the Bill as proposed does not give you that ability, it puts severe constraints both on the timetable that you can operate and the number of trains that you can operate on that corridor. I am not going to go into technical specifics about where, but that is the principle: that we need more tracks; we are simply saying that more passenger and freight trains can be accommodated in that corridor.

  8271. Then on Twyford, basically, again, in order to be able to maintain the level of service from Twyford station you do need those extra tracks, particularly between Airport Junction and the tunnel portal. Moving on to the additional routes, again I will not go into great detail, but if we can just highlight to you where they are, and hopefully we can zoom in on the section between Paddington and Heathrow.[42] All I want to illustrate here is that the routes that we are suggesting are different to the routes that the Promoters have considered. They overlap them but they are not wholly the same. Our G1 there, which is a branch to Uxbridge, would run up alongside the Central Line via Greenford and South Ruislip, and then turn off and follow the Metropolitan Line to Uxbridge. So that is not the same as route D which the Promoters looked at, which went to Uxbridge but that went via Harrow on a much more circuitous route.

  8272. Our route 2 goes via Willesden Junction and then Old Oak Common on the high level and then joins the District Line through Gunnersbury down to Richmond. Again, that is different to the route that the Promoters considered, which went to Richmond. G3 is simply incorporating the Greenford loop. G4 is something which was touched upon this morning, which was a western access to Heathrow, so that trains could get to Heathrow from the Slough and Reading direction. If we can just move across a little bit, G5 was very tenuous with the possibility of including Windsor, incorporating the existing Slough to Windsor branch as an extension of Crossrail. As I say, I am aware that you cannot add these routes but the reason we put those in is to show that there is spare capacity at the western end of Crossrail.

  8273. If I now move on to talk about passenger numbers, I actually do not have any passenger forecasts for the current layout of Crossrail, but I do have some from a document called the "Crossrail Business Case Summary" published in September 2003.[43] This is a chart at the bottom. The figures are in the evidence, but what this shows is the morning three-hour peak period. About 50,000 passengers would arrive from the east, 30-something-thousand from the Shenfield direction and 18,000 from what was the Ebbsfleet direction but is now the Abbey Wood direction. To the west the figures are much lower. The figures here are only a guide because the routes have changed since this report was produced. This report had the northern branch in the west only going to Heathrow; it did not include the Slough-Maidenhead extension. To the south it had the branch to Richmond and Kingston, and that has been removed entirely. That Richmond-Kingston branch was, in fact, the main generator of passengers at this time with nearly 20,000. So they have all gone. Now, the Promoters are only proposing to run ten trains an hour in the peak from the west; the remaining 14 trains an hour through the central section, which start at Paddington, would not serve west London at all. Ten trains an hour gives you a maximum, in the morning peak, of 30,000 passengers that you could bring in, therefore, from west London, because each train has a capacity of about 1,000. You are obviously not going to fill all of those trains all of the time, so we think that about 25,000 passengers would be able to come in to central London from the west in the morning peak, compared to 50,000 from the east. That seems to us to be a tremendous waste of a resource. Most of the cost of this project is in the central tunnel section, and to only use, essentially, half of that capacity from the west is a tremendous waste of a £10 billion-pound project—hence why we suggested some other branches which could be used from the west. There may well be other branches as well, but the principle is that only half the capacity is being used from the west, and to make sensible use of the central section all of the capacity from the west should be used so that we bring in about 50,000 passengers in the morning peak rather than just 25,000. Particularly, the Uxbridge and the Richmond branches that we have identified, I think, they could each easily bring in 10-15,000 people each morning, which would bring us up to the 50,000 capacity and, therefore, make full use of the central section. As I said, I will not go through all of the details of each of the five possible branches that we have discussed. It is in the evidence and I suspect it is something that only I and the Promoters would be terribly interested in debating.

  8274. If I move on to the issue of grade separation between Crossrail and the relief lines and a turn-back siding, these two things are very closely related. I wonder if we can get up one of Mr Berryman's slides, slide 5.[44]

  8275. CHAIRMAN: Have we gone on to page 7?

  8276. MR FRANCIS: Yes, we have. I am happy to go through the other couple of pages ----

  8277. CHAIRMAN: I will leave you to do it your own way.

  8278. MR FRANCIS: This is a picture of Old Oak Common from Mr Berryman's presentation this morning. In the middle of the picture you can see an inverted "Y", as it were. Where there are two lines there which meet is, essentially, Old Oak Common West Junction. Going off towards the bottom left is what is called the Wycombe line, and that is the one that we have suggested should be used for the service to Uxbridge. Going off towards the bottom right is the Great Western Main Line towards Slough, and towards the top of the picture is Paddington. In the fork there you can see what I think is an electricity substation. It is in that space there, in that fork between the two lines, that we think that the turn-back facility should be provided, because it could then be at a station. What we want there is a station both on the Main Lines, on the Wycombe lines and some turn-back platforms. Just off the bottom of the picture is the North London line, which could also have platforms on it, and I think, also, going across the bottom of the picture is the Central Line, London Underground. So you could have a very good interchange station there.

  8279. The Promoters in their response said that they did not think that a turn-back facility could be provided at that location without conflicting moves—i.e. one train having to cross the path of another. This very quick sketch illustrates a way in which it can be done.[45] The top pair of tracks is the Crossrail ones coming from the tunnel portal, the middle pair are the relief lines coming from Paddington and the lower ones are the Main Lines—the fast tracks—from Paddington. What we propose is a grade-separated junction at the location called Old Oak West and then with terminating platforms, which is where the trains would turn back. Those turn-back platforms can be reached, without conflicting moves, by trains coming from the Reading direction, going up the ramp, crossing over the Crossrail trains heading towards Paddington, going on to the Uxbridge branch and then turning off into the terminating platforms. The trains that are starting from that location would leave the terminating platform and would join the "up" Crossrail line and then pass underneath the branch to Uxbridge. So that avoids any conflicting moves. I am sure there are other layouts which can do the same thing, but that is simply to illustrate that it is possible to find a station with turn-back facilities at that location by combining the grade-separated junction for the various branches with the facility for a turn-back station there.



42   Committee Ref: A45, Crossrail Environmental Statement, Vol 1, Ch 6, Fig 6.2 Western Route Options (as amended by Petitioner No. 27) (SCN-20080422-006 and -007) Back

43   Committee Ref: A45, Figure 5.1: Crossrail Passenger Loadings (AM Peak Period) Central Area, The Crossrail Business Case-Summary, Cross London Rail Links Ltd, Strategic Rail Authority, Transport for London, September 2003 (SCN-20080422-008) Back

44   Crossrail Ref: P55, Old Oak Common-Oblique view looking east (LINEWD-XR7-005) Back

45   Committee Ref: A45, Old Oak Common-Petitioner No 27 proposed arrangements (SCN-20080422-009) Back


 
previous page contents next page