Select Committee on the Crossrail Bill Minutes of Evidence


Examination of Witnesses (Questions 9760 - 9779)

  9760. When Mr Berryman was giving evidence on day 21 he said that this particular improvement was neutral in terms of freights, do you agree with that?
  (Mr Smith) I was slightly surprised by that comment because freight and Crossrail will be sharing the relief lines. If it is a benefit to Crossrail, then it must also be a benefit to freight as well.

  9761. If we did come on to Southall, which is the next one.[73]

  (Mr Smith) This is a location near Brentford. The proposal here, and again Mr Berryman explained it and we fully support the concept, is to place between the relief lines and the main lines a waiting place for freight trains which are crossing from the relief lines to the main lines. Why do they cross? Because the yard at Southall is the only one on the south side of the line. At the moment, the train will get a green signal here and will cross all four lines and will hold traffic up in both directions on all lines. The new freight loop here (indicating) enables a train to move across into the centre and then, when there is space on the main line, move across into Southall Yard and it is a much more efficient use of capacity. Crossrail think it is a great idea, we think it is a great idea and it is not even one that requires Bill powers because it is to be built within the existing railway complex.

  9762. This is the one which is dealt with in the Environmental Statement and they say that it will be built in the Environmental Statement and we simply ask the Committee to ensure that. Then if we could come on to Airport Junction, there is the replacement drawing here at Airport Junction.[74] We have heard about this on several occasions.

  (Mr Smith) This looks like Airport Junction at night. The difference here is that, because of the intensity of service from Heathrow Airport, to which Mr Berryman was referring earlier, some of the services to and from Heathrow will be using the relief lines, whereas at the moment they are timetabled just to use the fast lines. The planned additional flyover here (indicating) will prevent those services from conflicting with services running up and down the relief lines. Again, like the other two schemes, this is not something that just benefits freight, it benefits Crossrail as well and overall increases the capacity on the relief lines of the Great Western Main Line, so it is something that all parties want, and I know there were a number of references to the fact that this is nearly as inevitable as the Acton dive under and all we are seeking is the commitment and the certainty that this piece of work will be done.

  9763. Is there any obvious alternative to serve Heathrow?
  (Mr Smith) I do not really want to get into a long debate about the alternatives for serving Heathrow. I think that has been debated before the Committee, but, if one works on the presumption that there is to be an increased level of service between Heathrow and the London area, the only way to get between the two is by using this infrastructure that has been outlined on this diagram.

  9764. We then come to West Drayton please, and again it is a replacement sheet.[75]

  (Mr Smith) There are two associated schemes here. At the moment, there is a goods loop into which freight trains will be moved to allow passenger trains to pass and that allows some measure of flexibility with the existing services, but it is not ideal and involves conflicting moves around this junction here (indicating). In the new plan, what is the goods loop actually becomes the primary operating line to be used by passenger services, including Crossrail, and freight services, but now there is a much more effective loop in the centre. It is a little bit like Southall, I suppose, which can be accessed from either direction and from both ends and, in so doing, therefore, prevents trains crossing the paths of what train is coming the other way. It is a layout which is being used elsewhere on the UK rail network. For example, it has been introduced at Tring on the West Coast Main Line and it is being introduced at Milton Keynes as part of the West Coast Main Line upgrade. Associated with the construction of the loop is the need to make sure that the platforms, which already exist, now have platform faces at which passenger trains can stop and passengers can join or alight, so at the moment a goods train will pull up from either side of the platform, but the platform is not fit for purpose for passengers getting on and off. So there are two pieces of work here, one to create this bi-directional loop, that is, a loop which is signalled for trains to go in either direction, but not at the same time, plus the upgrading of the platform faces to allow them to be used by passenger trains.

  9765. Again, how valuable do you regard that?
  (Mr Smith) It is the same as the other works in that it makes a much more flexible network and makes it for Network Rail, listening to Mr Gisby's comments earlier, much easier to operate the network and is, therefore, a benefit for all operators on this route and all types of traffic, so it is not something that is just for freight or just for Crossrail or just for the complementary passenger services. That is something that will make the overall timetable work much more effectively and I think this one in particular would be a significant contributor to increasing the public performance measure for passenger services to the level that customers demand.

  9766. Mr Berryman told me that he was not aware of any designing or modelling of alternatives to these. Have you come across any alternative freight improvements to these designed to work in conjunction with Crossrail?
  (Mr Smith) I am not aware of any freight alternatives to the ones that we have described.

  9767. Do you think that the Committee could safely assume that something else might turn up?
  (Mr Smith) I do not think that is a safe assumption. I would have expected within the three years that we have been debating Crossrail that, if there was some cracking scheme that would miraculously create capacity and enable all services to operate effectively, then we would have discussed it within the industry and might even have brought it forward. The fact is that the schemes that the Promoters have put forward are sensible and sound ones and ones on which we would like to rely.

  9768. Then Exhibit 26 we have already looked at in my opening.76 That is the undertaking which is being sought. Are you able to confirm that it differs in two ways from the undertaking which was sought in the other place, first of all, because it is restricted to fewer works? Is that right?
  (Mr Smith) That is correct. In the other place we, at a time of uncertainty, sought an undertaking that all the works in the Bill should be constructed, whereas this merely relates to five works to be added to the work that has already been committed to, the Acton dive under.

  9769. Secondly, in the other place we had a provision in which alternatives could be substituted with the approval of the appropriate committee chairman, the Chairman of Ways and Means, and there is no such provision made now. Why is no provision being made for substitution?
  (Mr Smith) Well, I think because at that time we were still some way from finalising the Bill, there was still some uncertainty, and we acknowledged that someone might have come up with a wizard idea to make things work better. Time has moved on, nobody has, and we are very close to the Bill being approved and the works starting, so I think we really

76  Committee Ref: A57, Undetaking in relation to key railway infrastructure works (SCN-20080430-055)

do need to be more definitive now and say, "These are the works that make the Great Western work for freight, but also make it work for Crossrail and make it work for other passenger services".

  9770. MR GEORGE: Thank you very much indeed, Mr Smith.

  9771. CHAIRMAN: Thank you, Mr George. Mr Elvin, if I remember rightly, the last time we dealt with undertakings about infrastructure work, it took you more than five minutes in cross-examination.

  9772. MR ELVIN: I will be a little more than five minutes with this witness, I should think.

  9773. CHAIRMAN: It might be better perhaps to leave it until tomorrow.

  9774. MR ELVIN: I think it certainly would be, and I have something else that I need to do, so would welcome the Committee rising now rather than sitting late, but we certainly would need to sit until 5.30 at least, I should think.

  9775. CHAIRMAN: Well, shall we stop now?

  9776. MR ELVIN: I would be very grateful, thank you. Your Lordships, we will deal with EWS to conclude tomorrow and then Lord Berkeley comes back with the Rail Freight Group after that.

  9777. CHAIRMAN: We are going to have Mr Garratt again, are we not?

  9778. MR ELVIN: To be re-examined, I think, yes. My Lords, what I propose to do by way of closing submissions is to give one set of closing submissions at the end, if that is convenient to the Committee, rather than separate them?

  9779. CHAIRMAN: Both for them and EWS?



73   Committee Ref: A57, Southall (LINEWD-103-05A-011) Back

74   Committee Ref: A57, Airport Junction (SCN-20080430-065) Back

75   Committee Ref: A57, West Drayton (SCN-20080430-066) Back


 