  11320. As a result of our meetings with Crossrail, we have been able to boil these issues down to one major issue which we say is overarching: the local impact of decisions yet to be taken during the detailed design phase. This forms section one of the exhibit, which is now on the screen, and is broken down into two subheadings, as you can see. Virtually all the other issues set out in the exhibit depend on decisions on detailed design which will be taken later. In section two, which is at the bottom of the page, we have included the most striking example of present uncertainty about detailed design, and the potential impact of it upon the local community, that is the design of the Crossrail station at Paddington and its impact, after the end of construction, upon local bus stops and stands, and upon short-term parking facilities near the station which are needed because of Paddington being a major transport node.

  11321. On the next page of this exhibit we set out the position as we now understand it on noise from trains in tunnels; this being the major element, for us, of groundborne noise and vibration. My witness will explain why, despite the agreement of the local authorities to Information Paper D10, we wish to bring this issue to your Lordships' attention. As you know, Mr Payne will be appearing before you tomorrow.

  11322. At this point I will merely observe that to the south of Paddington Station the tunnels pass under an almost wholly residential area, much of which has very low levels of background noise, where the tunnels are relatively shallow. If I may be permitted to contradict what Ms Lieven has said. at the northern end of the section the tunnels are less than 15 metres deep because there are three houses at the northern end which qualify for floating slab track. The depth of 24 metres is at the southern end where the tunnels pass under the Central Line and run under Hyde Park. The tunnels are declining from some 15 metres to some 24 metres in this section, which is less than half a kilometre long.

  11323. In section 4 of the exhibit, starting on page 6 out of 9, we show the key elements of present uncertainty on six other issues, which are also issues where we say that the local impact of later detailed designs is, to a degree, indeterminate at present.[10]

  11324. We accept that detailed design may well alleviate our concerns, but the difficulty is that we do not know what it is at present. We accept that the local authority will consult us under the Schedule 7 procedure when matters get to that point.

  11325. I also indicated to the Promoter, that despite the words in italics at the head of section 4, where I say that these issues are included as further examples of uncertainty but we may not produce evidence on them, we do wish to allude to the problem of the off-road capacity of the taxi rank, which is part of the first issue listed in section 4 at the bottom of the middle section, and to the question of the environmental impact of lorry routes towards the railhead at Paddington New Yard.

  11326. Finally, for the sake of completeness, the headings of a large number of issues included in our petition where we are content with the assurances now offered.

  11327. I call Mr John Zamit.

MR JOHN ZAMIT, Sworn Examined by MR WALTON

  11328. MR WALTON: Mr Zamit, will you please tell the Committee who you are and where you live?

  (Mr Zamit) Good morning, my Lords. I am John Zamit and I have lived for many years at 2 Claremont Court, Queensway, London W2 5HX, which is in the northern section of Queensway, in Bayswater, and not far from Paddington Station. I am chairman of the South East Bayswater Residents' Association, S-E-B-R-A, or SEBRA for short.

  11329. SEBRA is one of the four founder members of PRACT?
  (Mr Zamit) Yes, its area runs westwards from Paddington Station into Bayswater. SEBRA was founded in 1970 and is recognised by Westminster City Council as the amenity society for its area.. The alignment of Crossrail, from the footbridge up to Sussex Gardens which can be seen on the third map, 05-003, runs at the end or underneath SEBRA's area.[11]

  11330. What is the general attitude of SEBRA to Crossrail?

   (Mr Zamit) Along with the other founder members of PRACT we support the principle of Crossrail for the benefits it will bring to the local community and to London's economy but seek protection from the adverse effects of construction and operation. We have kept our members well informed about the Crossrail project. For instance, our last newsletter had a three-page article with colour illustrations devoted to PRACT's petition to your Lordships' House and our prospective appearance before you. Our members take a great deal of interest in Crossrail, and many of them hope they are still going to be alive when it finally gets going to take a ride on it!

  11331. I too, if I may say so! Could we please turn now to detailed design issues.

   (Mr Zamit) PRACT's concerns are summarised in section 1 of the synoptic table which is on page 5 out of nine in the exhibit. Let me say at the outset that we generally welcome the establishment of the Paddington liaison group, following the conclusion of the Select Committee in the House of Commons; and PRACT and its founder member associations will participate in the meetings of this group.

  11332. What then are your concerns?

   (Mr Zamit) The Promoter has told us that all designs for rail-connected structures, for which planning permission is conferred by the Bill once enacted, will be subject to the Schedule 7 procedure, under which the nominated undertaker puts detailed designs to qualifying local authorities, with an eight-week period for the authority to state reasonable grounds for objection. We are confident that, if this eight-week period can be observed, the City Council will go through consultation procedures with PRACT and its founder members as best possible, probably in a similar way to consultation on ordinary planning applications. The difficulty as we see it is about what happens before then. I hope it will not sound too presumptuous when I say that PRACT believes it could offer useful inputs to the design process at the formative stage from our local knowledge, and also could feed in thoughts about the impact of alternatives upon local residents and businesses, where there are feasible options being considered as alternatives.

  11333. What do you see as the solution to this problem?

   (Mr Zamit) I believe that it lies through a straightforward adaptation of the liaison group already established. We realise that as the detailed design proceeds there will be pressure for rapid progress in order to keep on the critical path. We therefore ask that Crossrail should undertake to call on an ad-hoc basis for more frequent meetings when required during the detailed design stage, probably of a small subsection of the large main group and not confined to long evening meetings. The long evening meetings have tended to take on-board some of the views, but it is a very packed-out meeting, a long meeting, and much of it is, "We'll get back to you later" or "We're still working on it" or "The design's changing". Above all, we ask that Crossrail should not forget, even when under pressure from deadlines, their offer to bring detailed design issues to residents. PRACT is willing to act as a framework for participation in such meetings if the liaison group so decides. When a firm design has eventually evolved and is put to the City Council under the Schedule 7 procedure, there will still be a formal opportunity for all concerned to comment, but at that stage it becomes cumbersome and time-consuming to get into the consideration of possible alternatives. It is sensible to have discussions earlier rather than later, and in this way time can be saved in the long-run.

  11334. What are your concerns about the design of sub-surface installations, in particular those under Eastbourne Terrace where, as we understand it, the design of the sub-surface section is not covered by the Schedule 7 procedure?
  (Mr Zamit) Our understanding is that the sub-surface construction is covered by the Environmental Minimum Requirements which deal, amongst other things, with the construction and heritage impact, but apparently do not place an obligation upon Crossrail to consult with qualifying authorities about the designs as such, except to the extent that the sub-surface design impacts upon the surface. An example of this at Paddington would be the location and design above the surface of the two ventilation shafts which are to be located between Eastbourne Terrace and the Departures Road, whose impact on the surface is part and parcel of the sub-surface design. On the new options for the design of this station, they can be seen, where indicated, on the Promoter's Exhibit 04-002.[12] Their impact above the surface would be covered by the Schedule 7 procedure, but not the sub-surface design of the station. We trust, therefore, that Crossrail will consult about the sub-surface design through the Paddington Liaison Group in just the same way as on the above-surface design.

  11335. Let us turn, therefore, to section 2 of the synoptic table, page 005, still on the first page.[13] What are your concerns about the three options of the design of the Crossrail station at Paddington which, I understand, may now have been reduced to two options?

  (Mr Zamit) Yes, on the direct impact of construction, we rest upon the Environmental Minimum Requirements and welcome Crossrail's undertaking, as set out in the Environmental Statement published with the Bill, to keep either Eastbourne Terrace or Departures Road open for a single lane of traffic in each direction throughout the construction period, except for occasional possession over the weekends or for very short periods.

  11336. What concerns do you have about the permanent impact of the construction of the station underneath Eastbourne Terrace?

   (Mr Zamit) Well, here there will be a substantial narrowing of Eastbourne Terrace and some widening of Departures Road under all options, it seems. The Promoter's Exhibit 04-002, headed `Possible layout of Eastbourne Terrace', indicates that the carriageway of Eastbourne Terrace between the kerbs of pavement, now over 15 metres wide in most places, will be reduced to about 10 metres, except where there are bays for bus stops and the like, and these would not exist on the option which retains the light spine, although maybe that has now been dropped. In our meetings with Crossrail last month, at each meeting we were shown a revised scheme of what was proposed, and no doubt it will change again in the future. Since the ventilation shafts need to be near the centre of the space between the frontages of buildings, the carriageways of Departures Road will become somewhat wider and would be at least 8 metres wide, it seems, between the pavement, which is mostly needed on one side only, and the wall or barrier on the other side. Another way of looking at it is to note that now Eastbourne Terrace is a four- to five-lane road with two pavements and that Departures Road has only two lanes for much of it, and three lanes in the centre, with only one pavement. After Crossrail, however, there must be the equality in the widths, unless the ventilation shafts are displaced a lot from the centre line.

  11337. What are the present uses of the two roads?

   (Mr Zamit) Very extensive at present. Eastbourne Terrace now accommodates extensive bus stands at its northern end and a bus stop on either side, crossing the middle. These stops are much-used for boarding and alighting by not only our members in the area, but for people using Paddington Station or the Underground station. Eastbourne Terrace also has 33 pay-and-display bays which are always full, two disabled bays, two or three drop-off spaces, a motorcycle bay which, I recently saw, contained no fewer than 54 motorcycles or scooters and two coach parking bays. Departures Road accommodates a set-down for hire cars and chauffeur-driven cars as well as taxis and space for delivery vehicles, and in fact under the present arrangements Departures Road is not solely for the use of taxis and you could drop off people or arrange to pick them up if they are waiting for you. Our concerns are two-fold. First, there will be an extensive loss of space for these necessary activities on all options for the design of the station and especially, we were fearing, on the light spine, although that has now perhaps fallen away. It is easy to say, as the exhibit suggests, that space for these uses can be found elsewhere, but I do not see where the space can be found and I am concerned that it could only be found at the cost of existing spaces for residents' parking in the highly residential streets where already residents' parking spaces are much in demand. The second aspect of our concern is that this overall loss could be alleviated somewhat if any spare space in Departures Road, a private road, beyond the necessary set-down and delivery spaces remained available for uses not directly related to the station, such as the motorcycle parking which is, as I say, full up and is really solely for the use of people using Paddington Station and it is not used by our members who have cycle parking elsewhere. Our understanding is that the ownership of Departures Road reverts to Network Rail once Crossrail construction is completed. In our opinion, it is essential that the widened Departures Road should be put to the best possible use for the benefit of everybody.

  11338. Can we now turn to noise from trains in tunnels.

   (Mr Zamit) I am no expert on this, but my understanding is that the design standards are based on the predicted outcomes from the use of standard form track with an uncertainty margin added. We suppose that there has been experience of predictions and outcomes in the case of similar modern standard form track when the Jubilee Line Extension and the London section of the Channel Tunnel Rail Link were built, but, in answer to our question, Crossrail told us in their letter of 1 May, "We are not aware of any published outturn measurements of groundborne noise from either the Channel Tunnel Rail Link London tunnels or the Jubilee Line Extension and so have no such information to pass on to you. In practice, measurements of groundborne noise from these services would only take place in the event of complaints, and we are not aware of any complaints to date". There is little comfort for Paddington residents affected by these works. We do not know whether there are comparable incidents of shallow tunnels under quiet residential areas in these lines, so we do not feel that Paddington residents can put much weight on the absence of complaints. Once the line is built, it is built and people may not see much point in complaining. They would just have to put up with the noise that they hear, especially in the early morning when background noise is very low. Whilst we welcome the inclusion of a five-decibel margin for uncertainty, it does occur to us that there must be some basis for this margin and we are not aware of what the basis is.

  11339. Do you have any thoughts on local conditions as they might affect the predictions for the PRACT area?

   (Mr Zamit) Well, we know from the Government's response to the conclusion of the Select Committee in the House of Commons that three houses at the north end of Spring Street qualify for floating-slab track or non-standard track form of similar effectiveness on the basis that the foundations are less than 15 metres from the apex of the tunnels. The only named house was the pub, the Pride of Paddington, which is on the corner of Spring Street and Craven Road. The response stated that, where there are basements, an allowance of 2.5 metres was made. We do not know whether all these houses have basements, but the pub has a cellar, even though the Circle Line runs beneath it, so presumably the foundations are correspondingly lower which implies that, at this point, the tunnels are some 17.5 metres below the ground level.



10   Committee Ref: A61, PRACT- Outstanding Issues-Synoptic Table (WESTCC-6_05-006) Back

11   Committee Ref: A61, Paddington Station-Crossrail proposals (WESTCC-6_05-003) Back

12   Committee Ref: A61, Paddington Crossrail-Possible layout of Eastbourne Terrace (WESTCC-6_04-002) Back

13   Committee Ref: A61, PRACT- Outstanding Issues-Synoptic Table (WESTCC-6_05-005) Back


 