  11340. What about the remainder of this section of tunnels?

   (Mr Zamit) Turning to the other end of this short section of tunnels of less than half a kilometre in length, in their letter to us dated 1 May, Crossrail quoted a depth of tunnel at the south-eastern corner of Sussex Square of 24 metres below ground level. The difference between this and 17.5 or 15 metres under the ground level at Spring Street suggests that the tunnels are relatively shallow in all this short section, so the similar enhanced track form would be suitable for the whole section. Other points relative to the detailed design are the inhabited basements above the tunnels where they pass under Sussex Gardens and that the block of flats also called `Sussex Square', which is on the north side of the square, has piled foundations.

  11341. Let us move on now to the other parts of the synoptic table where I have already indicated that you wish to give evidence. The first is the problem of overflow of the taxi rank at times of over-supply of taxis which are for hire. Could we please have Promoter's drawing 04-006 please.[14] What do you have to say about this?

  (Mr Zamit) Since this part of the exhibit also refers to the so-called `triangle site', may I at the outset say that we greatly welcome the late news, which your Lordships heard at the site visit, that there is to be a new joint forum, consisting of Crossrail, Network Rail, London Underground, Westminster City Council and the site owners, to study, and plan for, the future use of this site. In particular, we welcome the recent news conveyed to us at our last meeting with Crossrail on 24 April, that London Underground has funding for the much-needed upgrade of the station at Paddington on the Hammersmith & City Line, and plans to do this work between 2011 and 2013. We accept Crossrail's recent assurance that it will be practical to do this work with the new access ramp for taxis already in place alongside the Hammersmith & City Line. Turning now to taxis, I will firstly describe the present situation. As I have said before, taxis set down and pick up in the station's Departures Road, along with other vehicles. At times of heavy demand, taxis, which have set down, can move forward to an adjacent pick-up point as no other taxis are waiting. At other times, taxis, which have had to set down, must leave Departures Road and join the back of the taxi rank which often overflows on to two designated overflow paths on Bishop's Bridge, the new bridge across the railway. The problem with this overflow arises usually in the late morning or early afternoon. In all, there is designated space for nearly 80 cabs. At times, however, this is insufficient and the queue extends behind the designated area, beyond the bus stop and right into Harrow Road, so the taxis actually line up in Harrow Road waiting to get on to the bridge and, on occasion, that causes problems with buses, the 18 bus, going along Harrow Road, so there is an extensive queue for much of the time waiting patiently to get into the station.

  11342. What taxi-ranking will there be in the new situation when taxi access has been transferred to a new location on the site of the present Red Star parcels depot?

   (Mr Zamit) The new access arrangements are to be permanent, and we have been assured that they will not be interrupted during the works to improve the Hammersmith & City Line station or during later development of the triangle site. The proposed new pick-up and set-down points are indicated on the drawing. They separate licensed taxis from other vehicles taking people and goods to and from the station. The new access point will be closer than the present one to the strategic road network. We have not seen a detailed drawing, but the indication is that the double pick-up lane will be somewhat longer than at present. If so, circulation at busy times could improve.

  11343. What about the less busy times?

   (Mr Zamit) Taxis which have set down must still leave the set-down area and join the back of a queue. If it is longer than the available space in the Red Star area, it will extend, we have been told, to a designated part of the two inbound lanes on the ramp. When it extends this far or further, we hope that taxi drivers will go round the circulatory system at the junction with Harrow Road rather than doing a U-turn on the bridge, but we are not optimistic. We have been told that the off-road ranking capacity, including the space on the ramp, will be 79 taxis, the same as at present, which is an improvement in that it is all off-road, but the overflow problem at times is potentially the same as at present, it seems. We realise that one cannot seek to legislate to remove this problem, but we do ask that it should be revisited at the detailed design stage on the basis that the general improvements to be brought about by Crossrail should be used as an opportunity to address an existing problem, such as this one. One possibility, albeit expensive, would be to take up a little more land by making the access ramp four lanes wide instead of three, so as to extend the queueing space, coupled with the advantage of speeding up traffic flows on the bridge by increasing the capacity of the junction between the ramp and the bridge. Another suggestion is to create some queueing space on the bridge by moving the bus stop and pedestrian crossing from the east of the proposed entrance to the ramp to the west of it.

  11344. Thank you. Your Lordships may be glad to hear that we are getting close to the end. May we now turn to the removal of spoil by lorry to the railhead at Paddington New Yard near to Westbourne Park Station which is on page 05-007 of the exhibit, or at least that is the textual part.
  (Mr Zamit) I will try and be brief about this. I think there is a plan, 04-004.[15]

  11345. Thank you.

   (Mr Zamit) Yes, this matter concerns particularly to our member in the north, Paddington Waterways and Maida Vale Society. We accept reluctantly that lorries cannot turn left from Harrow Road into Great Western Road when they are heading from the railhead. If the left turn was allowed, there would be an overload at this junction which would compromise safe pedestrian crossing, nor is it suitable for heavy lorries to use Alfred Road, which is where the new Westminster Academy and several large blocks of flats are situated. The period during which spoil from the Paddington area would be carried by lorries using the diversion through the residential Chippenham Road and Elgin Avenue will be limited because later on they will be carried by conveyor alongside the railway. However, we have only recently realised in discussions with Crossrail that the potential problem lies with a much longer period during which spoil from Hanover Square and Tottenham Road Station sites is carried by lorry to landfill and whether by rail or not. We ask that overall the environmental consequences of the possible alternative routes for lorries carrying spoil from these sites should be considered at the detailed design stage as well as the traffic implications.

  11346. Thank you. Is there anything else you would like to say bearing in mind what the Committee have already learned this morning?

   (Mr Zamit) Just a couple of points. On the boundary of the Congestion Charge we welcome the assurance from Crossrail to Westminster City Council in Crossrail's letter to us on 1 May, this was the original assurance: "the Promoter is willing to continue to review and discuss the findings of the Transport for London study into the CC boundary with TfL. Westminster City Council, and the relevant stakeholders (including PRACT) in line with the requirements of the House of Commons ---"

  11347. If I may interrupt there, what was shown earlier just before we came on was this wording, but the words "including PRACT" did not appear. I do not think we need to take an issue on this because I think Westminster City Council would treat us as a relevant stakeholder. It is the case that the letter we received did include these words in brackets, "including PRACT".

   (Mr Zamit) We are not saying the Congestion Charge boundary has to be moved. We want the Congestion Charge boundary and the reason we want that is a direct result of the construction of Crossrail during the construction of Crossrail when there are going to be just two lanes open with only buses going south to north. There are only two lanes open during construction and that is the main arterial route from the free route of congestion charging. You come off the A40, the Westway, and the traffic comes off there, turns left into Bishop's Bridge Road, down Eastbourne Terrace, and then into Praed Street and eventually Edgware Road and Park Lane.

  11348. LORD JAMES OF BLACKHEATH: Would either of those lanes be designated a bus lane or taxi lane?

   (Mr Zamit) At the moment under the proposal to keep the two lanes open during construction they are not designated at all, so all the traffic that presently uses the free route off the Westway under the present situation will be going down a much reduced road. Of course, one has to bear in mind there will not be the taxis because the taxis would have been relocated to another permanent entrance and there is only one bus route. When statistics are looked at and figures taken forward they may well say that it can accommodate the free route, but they may not and all we want to do is have an input. If it cannot be accommodated, it has to be moved, going down probably Westbourne Terrace which affects our members greatly: the amount of traffic, congestion and pollution. Bearing in mind that one route of the buses, the north to south, is going to be directed into Westbourne Terrace all we are saying is because we know the feelings of our members and we know the area well, we want to be involved in those discussions rather than being given a decision by TfL that may be going to consultation which they would have to do if they are going to move. We would like to have an input. I think we are confident Westminster Council will have a dialogue with us but I do not think people have realised during construction the effect that possibly could be had on the free route. After Crossrail has been built and opened we have heard in my earlier evidence that it is a much reduced road. It is intended that because of the location of the station and Departures Road buses are going back on that route, so after Crossrail is finished we revert back at the moment to where we are of it being a free route and a bus route both ways. Of course at the moment the taxis going off the new bridge does not allow for private hire, minicabs or such, friends and greeters or dropping people off. We are concerned on all these issues, not only on our members but people coming to Paddington to pick up their grandmother or whatever and we think it has to have a dialogue with everyone to see the implications. That is our concern. I will leave it at that. We do think it is a direct result of the construction of this station at Paddington for Crossrail. It will have a direct effect on the flow of traffic in the area.

  11349. MR WALTON: The next point as well?
  (Mr Zamit) The diagram of Hyde Park site 001.[16]

  11350. Number 1, please.
  (Mr Zamit) Yes. Just briefly here. We are pleased now it is a much reduced site and also the ventilation and access for emergency services shafts are going to take a lot less time to construct now but what we are saying is obviously we would like to minimise the loss of trees and we think the Council and the Friends of Hyde Park should be informed of any proposals there in discussions with the Royal Parks. I do believe perhaps now the Royal Parks have to seek permission from Westminster Council for the felling or pruning of any trees. On this particular site I think we have had an assurance from Crossrail that all the lorries into this site, which is North Carriage Drive, which you would have passed on the last leg of your coach tour, all the vehicles in and out of that site will come in via Marble Arch gyratory system not via where you stopped in Stanhope Terrace-Brooke Street and I think we have agreement with them on that. The third point I would like to make is on 04-005.[17] This is a new document to us, it has our interest in. We have this new drawing that shows the temporary bus routes and stops and stands during construction as part of the Environmental Statement where the buses have to go down Westbourne Terrace from north to south. We need this dialogue and want to be involved in the design of it because some of the properties in Westbourne Terrace are large office blocks at the northern end more suitable for bus stands and stops whereas further down it is very residential and we are pleased to see that our suggestion for an additional stop in Westbourne Terrace now appears to be shown on this latest map at the northern end. We are pleased about that because we have a lot of elderly people in Brewers Court which we made reference to on your site visit. We are pleased about that. The last point I would make is that we are very happy they have agreed to put a canopy over Brewers Court to protect the residents, many of whom are elderly, in Brewers Court from this service which is 24 hours a day, seven days a week operation and all we would ask is we have yet to see any plans of the canopy and we assume whatever is built will have to be approved by Westminster because Crossrail has said it may be necessary that it has sides to it as well if it is to meet the noise standard to protect the people in Brewers Court. We have made some progress there and I am grateful they are recognising that they have to protect these residents in the adjacent block from any undue disturbance.

  11351. It may be, Mr Zamit, that some of these matters such as that you have just mentioned are covered in the undertakings which have been agreed between Westminster City Council and the Promoter but, my Lord, we are in the unfortunate situation of hoping that these undertakings are fully satisfactory but we do not know what they are. I apologise for some overlap or unnecessary repetition.

   (Mr Zamit) I was going to say, unfortunately, those last minutes in the corridors outside in agreement with Westminster we trust they have addressed many of the issues that you have been patient enough to let us put our point across. If there is anything else I can assist the Committee with or answer any questions, I am happy to do so.

  11352. MR WALTON: Would you remain where you are because there may be questions.

  11353. CHAIRMAN: Ms Lieven, it would be very helpful if you could go through these points and see to what any extent there is anything we can do. A lot of them are some way into the future.

Cross-examined by MS LIEVEN

  11354. MS LIEVEN: Indeed, my Lord. What I was intending to do is to ask Mr Zamit a couple of questions, but then to call Mr Berryman and go through with him where we were on various points. I suspect that would be more efficient than trying to deal with it by cross-examination.

  11355. Mr Zamit, on the consultation point, can I put up—I think it will have to be on the screen—the letter that we wrote to you on 1 May which you have alluded to but I do not think either of us has produced as an exhibit.[18] This part of the letter is dealing with consultation and it refers, first of all, to the Schedule 7 process and makes the point that we are confident you will be consulted via Westminster on Schedule 7 applications and I think you agreed with that, you have every confidence in Westminster City Council consulting you?

  (Mr Zamit) Yes, I think they will consult with us, but what we are trying to do is to have some input prior to a final scheme being sent to us for consultation. It is my experience in planning where the council have a deadline of eight weeks on an ordinary scheme, 30 weeks for longer, that if we speak to the applicant or the developer beforehand, you can save a lot of time, otherwise it gets amended at the last minute or in planning it gets withdrawn and resubmitted. Talking beforehand can save a lot of time in discussion at the end. On some of the issues we would like to have some involvement which we are hoping will come through these regular meetings.

  11356. I want to refine it down to where the issues are. So far as the Schedule 7 process is concerned, you have every confidence in Westminster. This is not the situation we have with some local residents groups where there is a concern as to whether or not the council will involve them. At that level you are happy with the position and then we come on to the words in italics which to some degree cover the concern that I think remains outstanding. What we have said is: "we intend at the appropriate stage in the design process to brief the Paddington Liaison Panel on our plans at the detailed design stage. However, the Community Relations Framework, as the title of the strategy makes clear, is designed primarily to apply to construction. This will be in addition to further information-sharing on design and other developments through mechanisms such as information centres". So far as your being involved is concerned, the panel will be given information about the detailed design stage, particularly relating to the construction phase and then there will be further information provided through the information-sharing mechanisms that we have set up along the route and that will cover both above ground and below ground works. Is that your understanding of the position?

   (Mr Zamit) That is my understanding. I have been to these liaison panels, I would not say it is chaotic but so many people with so many different interests, if anything there could be an argument that we have made this particular panel too large. It includes the bridge and it includes all the issues and there are so many people. On the night people are trying to get a word in too late because they are still working on things. It is not easy to achieve. It is too large a group to get down not just detail, but to find out what is going on in each aspect. By nine o'clock people are pretty tired and still waiting to speak. At the moment it is not the best location for these meetings and I just feel it is going to have to be split into much smaller groups looking at particular issues. The people on the bridge, as you said was spoken about a lot in this House, there is a lot of talk about this bridge in every single meeting.

  11357. You are talking about the footbridge?

   (Mr Zamit) It can dominate a meeting and other issues do not get talked about.

  11358. I understand all that and I will call Mr Berryman in a moment to set out our position, but presumably you can understand that we are building a railway (and I cannot, for the moment, remember how long it is) which is many miles long that goes through many residential communities and there has to be some limit on how many meetings we have at each location and with how many people in order to make the whole thing buildable. Presumably you can see that.

   (Mr Zamit) I can appreciate that. I do not know how many miles long it is but I can tell you how many years people have been talking about it, and it keeps changing every time. If it is just telling us what is going on, then I do not feel that we have an involvement, and I do believe that PRACT is attempting to bring together a very large number—thousands—of people—under one roof rather than each individual group wanting to get involved. I think they have certainly got to make changes to the liaison panel. When I have seen other information centres I have been to, exhibits in Porchester Hall, you cannot ask detailed questions and I raised a couple of points and they could not be answered on the day. They are interesting for passengers going through Paddington and the public just popping in, but I do not think they are an opportunity to get into any real detail, that is all. As I said before, in one month we were presented with two different schemes, and it seems to me that they are listening to us when we put points forward in that early design stage they are being taken on board. Our concerns and views on Eastbourne Terrace, the reduced width with the spine, was taken on board and we asked them to take into account the dropping of the road—the advantages to us in having a level surface with the Departures Road. So they are listening and we have had this opportunity to talk to them now because we are in front of you today, but there have been frenzied to-ings and fro-ings in all parties—and much of it is coming in late—but I just feel we have got a lot to offer.

  11359. There is just one other thing I want to touch on with you, which is the design of the taxi pick-up and drop-off. Can we put up 6-04-006?[19] I think you made this point in your evidence but I just want to be absolutely clear on it. If we focus in on the bottom right drawing, under the existing situation at Departures Road, if a taxi drops somebody off it then has to go all the way down to the end of Departures Road, U-turn, back up Eastbourne Terrace, back round to the roundabout and then back in again in order to join the queue to pick somebody up. So you have got this very complicated manoeuvre for the taxi to do both things. Under the new scheme on the Red Star deck taxis are intended to be able to set down and then immediately pick up on the same manoeuvre. That should be a significant advantage under the new scheme, should it not?

  (Mr Zamit) Yes. That is exactly what we said. The present scheme is a long way round. You actually can, legally, under the present scheme, do a U-turn on the bridge to join the rank, if it is not that long. You only have to go down to the gyratory system if the rank is completely full up. There are two U-turn provisions, and the new system is better. I do not think any of us know what the demand on taxis or people dropping off is going to be in the future, because Crossrail, in theory, will enable people to go all the way east. So it will not be the major hub now, Paddington, where it is very difficult to get a taxi. We do not know the effect on numbers of passengers not only with Terminal 5 coming on board but, perhaps, another runway. So it is difficult, in the future, to see—I do not know if figures have been produced—what the likely impact is on the number of taxis. All we know on the present day is that 79 spaces is insufficient to have a proper system working. You have heard me talk about the problems it is causing in Harrow Road. So if demand for taxis goes up we have still only got 79 spaces being allocated, and that is probably all you have to provide—you are losing 79 and you are providing 79. We are just asking that it is explored on the measures we have indicated—that that should be tried and be improved for a new station. If there was a big demand from Crossrail at Paddington there will be even more taxis queuing up.



14   Committee Ref: A61, Paddington Station-Taxi Provision (WESTCC-6_04-006) Back

15   Committee Ref: A61, Paddington Station area-Lorry routes (WESTCC-6_04-004) Back

16   Committee Ref: A61, Hyde Park shaft-worksite layout (WESTCC-6_04-001) Back

17   Committee Ref: A61, Paddington Station-Proposed Temporary Bus Routes, Stops and Stands during construction (as per Environmental Statement) (WESTCC-6_04-005) Back

18   Crossrail Ref: P77, Correspondence from CLRL to PRACT, 1 May 2008 (SCN-20080506-003) Back

19   Committee Ref: A61, Paddington Station-Taxi Provision (WESTCC-6_04-006) Back


 
previous page contents next page

House of Lords home page Parliament home page House of Commons home page search page enquiries index

© Parliamentary copyright 2008