The Economics of Renewable Energy - Economic Affairs Committee Contents


Memorandum by the Campaign for Responsible Energy Development in Tynedale (CREDIT)

  1.  I am writing in response to the House of Lords Economic Affairs Select Committee's call for evidence regarding the Economics of Renewable Energy.

  2.  I act as Secretary to the above organisation (CREDIT), a community group formed to represent the views of local residents (and other concerned individuals) faced with a seemingly uncontrolled, unco-ordinated free for all by energy companies seeking to build multiple large scale windfarms in the Knowesgate area of Tynedale, Northumberland.

  3.  I stress from the outset that CREDIT does not claim to possess either the technical or commercial expertise to comment with any great authority on the relative costs of the various forms of renewable energy production. However, we are particularly keen to share our experiences with you in regard to your questions "How do the external costs of renewable generation of electricity—such as concerns in many affected rural areas that wind farms and extra pylons spoil areas of natural beauty—compare with those of fossil fuels and nuclear power? How should these be measured and compared? Is the planning system striking the right balance between all the different considerations?"

  4.  It is with particular regard to the last issue listed above, that CREDIT seeks to draw the Committee's attention to a factor which is routinely overlooked when the costs/benefits of renewable energy (and in particular onshore wind energy) are scrutinised, namely the enormous cost to the public purse in contesting lengthy, extravagant and often wholly unnecessary public inquiries.

  5.  CREDIT wishes to advise the Committee of its own experience but is acutely aware that such experience is being repeated across most of the rural areas of England because of the headlong rush by developers to take advantage of the huge Government subsidies and liberalised planning regime which currently favours the building of onshore windfarms almost to the exclusion of everything else.

  6.  The Knowesgate area lies within the district of Tynedale, in mid-Northumberland. The Committee might be familiar with the term "Wilds of Wanney" and indeed the Knowesgate area sits squarely within it. The area is deeply rural and, as you would anticipate, is not densely populated. There are only a few centres of population as such (Kirkwhelpington, West Woodburn, Redesdale) with the remainder of residents living in small hamlets or isolated farmsteads and cottages. There are few community facilities and very little public transport. However residents place a high value on the peace, tranquillity, cultural heritage and largely unspoiled nature of their surroundings and many have founded small businesses based on leisure and tourism activities.

  7.  Responding to central Government planning policy directives, the North East Regional Assembly has prepared a Regional Spatial Strategy (RSS)[27] which requires that local planning bodies must include an overall renewable energy target for the region with details of the contribution to the total which will be made by sub-regional partners. In the case of the County of Northumberland this equates to 212MW by 2010. It should be noted that this target is meant to cover renewable energy from all sources and technologies. This sub target is not broken down any further into district level contributions but, given that the document recognises that onshore wind energy is likely to contribute the largest share of the target, it goes on to indicate that within Northumberland there are six "Areas of Least Constraint" (ALC's) where onshore windfarm development might be acceptable. The Knowesgate area of Tynedale is designated as one of these ALC's.[28]

  8.  The RSS has been in production for some considerable time and is now going through its final re-drafting prior to formal adoption within the next month or two. It is, in fact, this particular piece of planning policy which, in CREDIT's opinion, has prompted the present situation in Knowesgate whereby five different energy companies are vying to build six major windfarms all within the space of a few square kilometres. That in itself would be problematic enough, but the obvious difficulties are compounded by the fact that the output from some of these windfarms falls below the 50MW threshold whereby they are determined by the local planning authority, whilst others exceed this threshold whereby they are classed as Power Stations and determined by the Secretary of State for BERR. Thus applications are submitted to and decided by two different regimes. It is therefore not difficult to understand the complexities which arise in considering the matter of cumulative impact of multiple wind farm schemes.

  9.  As we have noted, the Knowesgate area has been identified in the RSS as an ALC but it is clearly stated that the area may be suitable for medium scale development which is further defined as being between 20-25 turbines. However, despite the fact that one particular energy company (AMEC) had been actively investigating the possibilities of a windfarm on Ray Fell since the mid-1990's, the policy steer provided by the Government in the form of PPS 22, its Companion Guide, various Energy White Papers, ministerial announcements and of course the system of ROCs has resulted in other developers jumping on the subsidy bandwagon and signing up willing landowners in the vicinity with a view to erecting even more turbines. The local community has been completely overwhelmed and, in no small measure, intimidated by the heavy handed and irresponsible tactics used by the developers. Not only that, but the issue is socially divisive, setting neighbour against neighbour, landlord against tenant and, in some cases, family member against family member.

  10.  The North East Assembly eventually recognised the acute problems which this "gold rush" mentality was causing in the Knowesgate area (although we should point out that this situation is not unique to Knowesgate and that other ALC's within Northumberland are being subjected to similar attentions) and, as part of the RSS suite of documents, commissioned a series of Landscape Capacity Studies from the Ove Arup partnership. Their report recommended appropriate levels/locations of wind farm development for each ALC which struck a balance between renewable energy generation and landscape and visual considerations. The report concluded that in the (two separate but adjacent) Areas of Least Constraint at Knowesgate and Harwood there was potential capacity to accommodate 100MW of wind energy generation. The report suggests a fairly even split of this potential total between the two ALC's ie. approx 50MW each.[29]

  11.  Sadly the slow response and belated intervention by the Regional Assembly and its constituent partners meant that by the time the landscape capacity report was commissioned there were already three separate planning applications on the table for the Knowesgate ALC alone; Steadings (21 turbines, H J Banks) Green Rigg (18 turbines, Wind Prospect) and Ray Fell (now 16 turbines, AMEC). These windfarms, totalling 55 turbines with a combined output of approximately 150MW, are currently the subject of a joint local Public Inquiry which commenced in January 2008 and is likely to continue until at least October if not beyond. Unfortunately it appears that the fact that there is currently an ongoing public inquiry into three existing applications has done little to deter other developers and there are now three further applications in the same vicinity at scoping/pre-application stage which together could total a further 28 turbines. Indeed at the time of writing this submission we have just been notified through the post of NPower's intention to formally submit a planning application for an eight turbine development at Kirkharle.[30] Details of the current Public Inquiry and its associated documentation can be accessed at http://www.persona.uk.com/tynedale/Tynedale.htm

  12.  There have been objections to all three current applications from both County and District councils as well as from the Northumberland National Park Authority, the Ministry of Defence, Newcastle International Airport, NATS En Route Ltd and English Heritage to name but a few.

  13.  CREDIT is playing a major role in the PI and believes that evidence submitted to the Inquiry on the basis of compliance with national and local planning policy, land use, heritage, culture, ecology and, perhaps most fundamentally, aviation concerns means that there are serious doubts about whether any of these developments will be consented. Nevertheless, publicly funded agencies have been compelled to participate in the PI at great expense and, given the applications in the pipeline, may well be forced to do so again in future. It is therefore unarguable that the high levels of subsidy on offer make it worthwhile for developers to engage in purely speculative applications on the off chance that they might just be able to convince the powers that be that the need for onshore windfarms as an alternative source of energy outweighs all other considerations.

  14.  CREDIT do not believe that such blatant free for alls were ever the intent of Government policy and we understand that more enlightened Ministers and their advisers are rightly concerned that there is now an over emphasis on onshore wind energy almost to the exclusion of all other technologies, many of which are far more efficient and far less intermittent than wind turbines. The fact that the planning system is log jammed from end to end with windfarm applications is not, as the British Wind Energy Association would have us believe, due to intransigent local authorities persisting in refusing permission for windfarms in their area, but is rather a product of Government planning and subsidy regimes which have been interpreted by the developers as carte blanche to build as many onshore windfarms as they possibly can irrespective of the impact on local landscapes and communities—and all apparently in the name of national policy.

  15.  However it is worth noting that it is often the case that many of the issues which PPS22 advises should be resolved by the developers before planning applications are submitted are left unresolved in the stampede to get applications on the table. This is especially true of aviation matters where the onus is firmly on the scheme promoters to prove that their proposals will not affect aviation interests and/or safety. The fact that three aviation bodies (MOD, NATS en Route and Newcastle Airport) have all objected to each and all of the schemes under scrutiny at the current (Knowesgate) Public Inquiry demonstrates the difficulties which statutory and other interested organisations have in convincing the developers that when they say no they mean no.

  16.  The planning regime is therefore in part responsible for encouraging this headlong rush for onshore wind which, if left unchecked, will lead to an over -reliance on a technology which is unreliable, intermittent and, on current evidence thus far, has failed spectacularly to live up to the claims made for it by its supporters in terms of both energy production and reductions in CO2 emissions.

  17.  We have no doubt that other contributors to this Inquiry will provide the Committee with convincing and well-founded arguments regarding the real cost of on-shore wind energy and we are not minded to repeat such arguments here. We simply make the point that the cost to the public purse of processing speculative and ill-conceived applications is rising exponentially as more and more local authorities find their decisions being challenged by large, well-resourced developers willing to ride roughshod over local authorities and local communities.

  18.  We are aware that in terms of the present Inquiry, Tynedale Council has set aside £250,000 to pay for legal advocacy and expert opinion. A leading Councillor has indicated to us off the record that the Council is expecting that it will get no change from £1 million when everything has been paid for. For a small rural district council this is a substantial amount of money and it needs to be viewed alongside those costs which will be similarly incurred by Northumberland County Council, the MOD, Northumberland National Park and English Heritage in providing evidence to the Public Inquiry. Given that this is not the only windfarm Public Inquiry in which such agencies have participated it is self evident that considerable sums of money are involved. If such sums were multiplied throughout England the bill must surely run into tens of millions of pounds already, with the likelihood of more to come as applications continue to pile up in the planning system. To the best of our knowledge this is a price which has never been factored in to any previous discussions on the cost of renewable energy.

  19.  CREDIT believes that the present situation is inherently unfair and indeed many in our group speculate as to whether this kind of "carpet bomb" approach by the developers is a deliberate tactic designed to either intimidate local authorities and local communities or bleed them dry of the resources and political will to contest the applications. The cost to local people participating in the process is prohibitive; as CREDIT has already pointed out in their evidence to the Public Inquiry[31] for us to raise funds to contest one application would be onerous enough, to contest three is quite simply beyond our means.

  20.  CREDIT would be delighted to provide further information to the Select Committee should they require it and would be most happy to appear in front of the Committee if this was felt appropriate. In any event we trust you will find this statement worthy of your consideration and helpful to your deliberations.

9 June 2008




27   North East Regional Spatial Strategy Original Draft 2005 Policy 42 Onshore Wind http://www.northeastassembly.gov.uk/document.asp?id=614 Back

28   North East Regional Spatial Strategy with Sec of States Further Proposed Changes Feb 2008 http://www.gos.gov.uk/nestore/docs/planning/rss_fpc/a_maps.pdf (Page 225) Back

29   Ove Arup (for the North East Assembly) Windfarm Development and Landscape Capacity Studies; Knowesgate and Harwood Forest June 2006 http://www.northeastassembly.gov.uk/document.asp?id=390 Back

30   Tynedale District Council Submission to Knowesgate Windfarm Public Inquiry showing current windfarm proposals at planning and pre-planning stage http://www.persona.uk.com/tynedale/PROOFS_STATEMENTS/Tynedale/Add_Docs/TDC-0-02.pdf Back

31   CREDIT Proof of Evidence Submission to Knowesgate Wind farms Public Inquiry Dec 2007 http://www.persona.uk.com/tynedale/PROOFS_STATEMENTS/CREDIT/Proofs/CREDIT-1-1.pdf Back


 
previous page contents next page

House of Lords home page Parliament home page House of Commons home page search page enquiries index

© Parliamentary copyright 2008