1 Improving living accommodation
1. The Department provides accommodation to many
members of the Armed Forces and their families. There are currently
47,000 family houses and over 110,000 single living spaces in
the United Kingdom.[3]
Over 40% of accommodation for families (Figure 1) and more
than half of single living accommodation (Figure 2) do
not meet the Department's definition of high-quality accommodation
and are therefore substandard.
Figure 1. Condition of Service Family Accommodation
Number of Properties
Figure 2. Cumulative delivery of new Grade 1, En-Suite Single Living Accommodation in Great Britain
Bedspaces
Note: SLAM is the Department's Single Living Accommodation Modernisation Programme
2. Operational deployments overseas, where Service
personnel often live in basic quarters, have increased in frequency
and so the availability of decent accommodation in the United
Kingdom is more important than ever. The Department agrees that
the standard of accommodation plays a significant role in recruitment
and retention.[4] A recent
report by the Comptroller and Auditor General showed that 40%
of Armed Forces personnel working in trades which suffer from
recruitment and retention difficulties were dissatisfied with
the quality of their accommodation.[5]
Complaints by Service personnel about the quality of housing have
been prominent in the media.
3. In the last decade, changes to the design of accommodation
mean that the best new and refurbished housing is of a high quality.
For example, dormitory accommodation for single Servicemen has
been replaced with individual, en suite bedrooms, orientated
around shared kitchen and living areas.[6]
One side-effect of these improvements in specification is to increase
the gap between the best and the worst accommodation, a change
which the Department believes is, in part, behind the recent increase
in complaints about substandard housing by Armed Forces personnel
and their families.[7]
4. In seeking to improve the overall standard of
its accommodation, the Department carries out four activities:
the maintenance of existing stock to prevent deterioration; the
refurbishment of existing stock; the construction of new accommodation;
and the disposal of low-quality accommodation through demolition,
sale or the termination of a lease.[8]
The Department has not done enough in the past to maintain its
stock of accommodation in good condition, and it acknowledged
that expenditure on housing had often been an early casualty when
savings were required.[9]
5. The cost of maintaining existing accommodation
is likely to be lower, and so more cost-effective than refurbishment
or new construction. The Department has missed opportunities to
improve maintenance. In 1995, most defence family houses in England
and Wales were sold to a private company, Annington Homes, and
leased back by the Department in a deal which raised £1.7
billion. These assets were sold at a discount of between £77
million and £139 million, with the Department retaining responsibility
for maintaining houses it no longer owned. We took evidence from
the Department in 1997 and criticised these and other aspects
of the deal.[10] The
Department has acknowledged that it would not enter into the same
arrangement again.[11]
6. In 2006, a new contract was let with Modern Housing
Solutions to maintain family houses in England and Wales for seven
years, at a cost of between £580 million and £690 million.
The contract should prevent any further deterioration of the existing
stock. In the first year, however, its performance was marred
by poor delivery. The Department and the contractor had failed
to understand the backlog of work needed, and suffered from inadequate
management information. As a result, in 2006-07 the Department
had to spend an additional £20 million above the £100
million that had been agreed.[12]
7. The Department is funding a number of projects
to refurbish existing dwellings and to construct new accommodation
(See Figure 3). Cuts to the budget of Defence Estates in
2006-07 were applied in such a way as to minimise the impact on
these projects.[13] Planned
investment in quarters for single personnel will still however
leave 35,000 substandard bedspaces in 2013, assuming no budget
cuts or deterioration of the stock.[14]
If the Department is only able to afford 900 upgrades of family
houses each year, it will also take more than 20 years to improve
all substandard homes.[15]
The Department had allocated £17 million for upgrades and
£35 million for redecoration and other improvements such
as boiler replacements in 2007-08, and it believed that this funding
was secure.[16]
8. A proportion of substandard accommodation is in
very poor condition, and could have a significant adverse effect
on the Service personnel and families who live there, and on morale
in the Armed Forces more generally. In response to a report that
there had been an infestation of vermin in single living accommodation
at the Chilwell site in Nottinghamshire, the Department investigated
and found that there had been no incidents of pest infestations
at the site.[17] Currently,
of the 19,000 substandard family homes, 138 are at the lowest
Standard 4 and a further 2,000 are at Standard 3. These properties
typically require new kitchens and bathrooms, rewiring, new plumbing
and insulation and may be in poor decorative order.[18]
The Department agreed with General Sir Mike Jackson's comment
that the state of the worst of its accommodation was 'frankly
shaming'.[19] Yet whilst
it intended to upgrade or dispose of these properties as a priority,
the Department had set no deadline for completing this task.[20]
It believed that practical difficulties, such as widely dispersed
locations and ongoing occupation of the properties, made setting
a deadline impossible.
Figure 3. Projects that will deliver new and refurbished accommodation.
| Project | Type of accommodation
| Timeframe
| No. of houses/ bedspaces delivered
|
| Allenby/ Connaught PFI project | Single living accommodation
| 2006-16
| 11,000 bedspaces
|
| Single Living Accommodation Modernisation (SLAM) Phase 1
| Single living accommodation
| 2003-08
| 9,000 bedspaces
|
| Defence Training Review Public Private Partnership Phase 1
| Single living accommodation
| 2008-13
| 5,000 bedspaces
|
| Single Living Accommodation Modernisation (SLAM) Phase 2
| Single living accommodation | 2008-13
| 3,800 bedspaces
|
| Colchester Garrison PFI project | Single living accommodation
| 2004-08
| 2,230 bedspaces
|
| Faslane 'Neptune' project | Single living accommodation
| 2003-09
| 1,750 bedspaces
|
| Plymouth 'Armada' project | Single living accommodation
| 2004-08
| 1,340 bedspaces
|
| Housing upgrade programme | Family accommodation
| 2007-08 and ongoing
| 900 houses annually
|
| Northwood Headquarters Public Private Partnership project
| Single living accommodation
| 2006-10
| 720 bedspaces
|
3 C&AG's Report, paras 1.25, 1.28 Back
4
Qq 7-9, 64-66 Back
5
C&AG's Report, Recruitment and Retention in the Armed Forces,
Vol. 2, HC (2005-06) 1633-II, pp 10, 13 Back
6
Qq 35, 42 Back
7
Q 44 Back
8
Q 11 Back
9
Qq 4, 35, 40 Back
10
Committee of Public Accounts, Forty-eighth Report of Session 1997-98,
Ministry of Defence: Sale of the Married Quarters Estate,
HC 518, para 3 Back
11
Qq 49-51 Back
12
Q 83 Back
13
Q 12 Back
14
Q 67 Back
15
Q 67 Back
16
Qq 5-6 Back
17
Qq 17-19 Back
18
Q 16 Back
19
Q 35 Back
20
Qq 10-11, 16, 67 Back
|