  Q220  Mr Williams: The maps that the Environment Agency produced which show how often a flood may occur in a particular area may or may not be accurate, but what they do not show is the risk to life of a particular flooding incident. An area might flood and it might be distressing and inconvenient, but it might not present a risk to life or serious risk to property. Does your Strategic Flood Risk Assessment do that?

  Mr Charlton: It does not really, no.

  Professor Coulthard: I believe the Hull one does come up with a form of risk attached to it based on the depth and velocity of the water.

  Q221  David Lepper: Colleagues from Sheffield, could I concentrate on one aspect of planning with you. I think the Environment Agency regards Catchment Flood Management Plans as very important, both in terms of looking at land use and planning for land use, to help prevent and mitigate flooding, but by the time you produced your Strategic Flood Risk Assessment and published that, the Catchment Flood Management Plan—I am not sure whether we are talking about one or two here, one for the Don and one for the Rother—had not been completed.

  Mr Charlton: When we started preparing the Strategic Flood Risk Assessment it was originally intended that the Environment Agency would have their Catchment Flood Management Plan in place but it was delayed and it has since been further delayed. In fact, they have changed it now from instead of a whole catchment area to a River Don catchment that will take in Sheffield, Doncaster and Rotherham. They are doing a Management Plan for that floodplain for the River Don and that will inform our Strategic Flood Risk Assessment. It would have been better if the horse had come before the cart but it did not and we had to do something. As I said, it is a live document and it will be reviewed when the Environment Agency's work is completed, which is likely to be April 2009.

  Q222  David Lepper: I thought that was the date you mentioned earlier.

  Mr Charlton: Yes.

  Sir Robert Kerslake: It is important to say that timing for the Environment Agency is entirely an issue of their priorities and resources. Other parts of the region were at significantly higher risk of flooding and impact, so it was quite understandable from my perspective that they came ahead in this process of producing the plan.

  Q223  Chairman: I think the way you put it in your written evidence was delayed "due to funding priorities". Perhaps if we had the Environment Agency here with us they would say if they had had more money to do the work it might have been completed sooner, but they had to look at what they regarded as higher risk areas first.

  Sir Robert Kerslake: Absolutely.

  Q224  David Lepper: Could I ask how much input Sheffield City Council has had into the work that has gone on so far on the Catchment Flood Management Plan?

  Mr Charlton: I understand that a consultant has been appointment by the Environment Agency and as yet they have not contacted us to ask for information, but I assume they will do in the fullness of time.

  Q225  David Lepper: So throughout the whole of this process—

  Mr Charlton: Sorry, no. They have only recently appointed a consultant to carry out a Management Plan of the River Don catchment area which will take in Sheffield, Doncaster and Rotherham and, as yet, they have not contacted Sheffield for any information.

  Q226  David Lepper: Is that odd or is the timescale such that you are not particularly surprised?

  Mr Charlton: If they have not asked us before Christmas I will be surprised, yes. Rather disappointed, put it that way.

  Q227  David Lepper: Perhaps they will remember to ask you reading the evidence. It would have been helpful to have the plan in place to aid your strategic flood risk assessment?

  Mr Charlton: Yes.

  Q228  David Lepper: Would you agree with the Environment Agency's view that there were, not knowing what we know now, higher risk areas that needed greater attention?

  Mr Charlton: You have just heard what my colleagues from Hull have said, and historically Sheffield has never been prone to flooding on that scale. It is now likely to be a one in 150 year event that we experience.

  Sir Robert Kerslake: This is pretty wide really. This was the highest rate for 125 years. You cannot predict that will happen but, having happened, you have to reassess the risk.

  Q229  Chairman: Is there any danger that we have got too many bits of exercise going on to get a coherent picture? When I started to read we had got these strategic flood risk assessments, and then I looked at what your assessment in Sheffield was supposed to cover and one of the key first paragraphs I read is, "To collate all known sources of flooding, including river surface water, local drainage, sewers, ground water, that may affect existing and/or future developments in the district", and then I discover that you are working very closely with the Environment Agency, Yorkshire Water and a lot of other bodies, and then we have got the Environment Agency who are doing their catchment flood management plans. It seems to me that you have got one lot doing one thing, one lot doing another; whereas in actual fact what you want to plan, which then breaks down from a big thing, is how it impacts on a city like Sheffield. The main driver which seemed to be pushing your strategic flood risk assessment were planning issues—this bit which I still do not understand—the operation of something called the "sequential test" followed by the "exceptional test" under PPS25, and so the idea of coherence in planning seemed to be muddled.

  Sir Robert Kerslake: I think the point that John made is right, which is that in an ideal world you would do the catchment management plan which would then inform the risk assessment, but, because of priorities and resources, it was pretty evident to us that we were not going to see our catchment management plan done for Sheffield any time soon, or the wider area, and we needed guidance in order to inform our planning decisions and other actions, hence the reason why we did the strategic risk assessment that was talked about. I think there is a coherent model here, but the model probably relies, in fact does rely, on the sequence of the things happening in that order.

  Q230  Chairman: In other words, there should not be any cart before the horse situations, if you are going to get the benefit of one model informing the other?

  Sir Robert Kerslake: I think that is right, but in the end you cannot hang around, you have to have something that guides your planning decisions.

  Councillor Wilson: Could I just add that it would be great to do things in the order that you have suggested, but the particular corridor here is where we are doing a lot of master planning for our economic growth, making plans for the next ten, 20, 30 years, and it is necessary to have master plans of what our aspirations are, hence the work that has gone on in advance. There is significant work in Sheffield to do with growth. It would be great to have all the ducks in an absolute row, but Sheffield has not been a high flood risk area, so the planning work that was done, particularly within the regional spatial strategy that has been drawn up through Yorkshire and the Humber, gave us comfort in order to continue with our development, because the world does not stand still, does it, and that is our industrial corridor where we want our growth to take place.

  Chairman: It raises some of the big issues as to how all the assumptions that are being made about where risk occurs react to climate change/extreme weather events. This Committee did an inquiry into the Foresight Report, which was done by the Government's Chief Scientist, which counselled taking into account, according to which scenario you chose, the fact that there would be extreme weather events. I do not want to get into territory which is beyond my technical understanding, but I think what has happened has focused people to say perhaps we should be re-looking at what the impact is going to be of severe weather events and then decisions are going to have to be taken as to what degree of the protection your systems can afford to provide according to what scenario you chose, and I think that is quite a difficult choice. Anyway, before we get too far into the realms of conjecture, we will move on to Roger.

  Q231  Mr Williams: The Environment Agency has done a survey of critical infrastructure installations and found that a fair proportion of those are at risk from flooding. As I understand it, in Sheffield you had problems with power failure, whereas in Hull most of your services remained working during the flood. What critical installations have you identified in your city? Have you done that work?

  Sir Robert Kerslake: Absolutely. We know where the risk sites are and, indeed, you are quite right, 35,000 people were without power because of the impact of the flooding. It struck me, going round the particular power station at which this happened where the step-down transformers are, that there were some fairly simple things that you could do to increase resilience. For example, two of the transformers are on the same side, so it stands to reason that, if it floods, they are both going to be out of action. You could locate one or create another one somewhere else in the system away from the flood risk area. Similarly, the thing that went when the flooding happened was all the electrical equipment, which was on the ground floor. If you put it up higher, you probably would face much less damage being done. What became absolutely evident to us is that we need these utilities—electricity and gas—more actively engaged in the analysis of prevention and then response to emergencies. They have not been round the table, basically, and I would go so far as to say they are not entirely equipped to be round the table, their capacity works in a different way, and that is a major issue that has to be addressed in any future planning.

  Q232  Mr Williams: It brings me on to the other point, which is that within the Civil Contingency Act there is a requirement of utilities to actually plan for major problems, and I think the Environment Agency said that many of the utilities did not have in existence business continuity plans. What responsibilities do local authorities have under the Civil Contingency Act?

  Sir Robert Kerslake: We have clear responsibilities in terms our own business continuity, and we do that and those plans worked. I think the biggest risk came in other areas, in my view—it came in the power and related activities—and your description of the fact that there were not always plans there I think is right. I think that is one of the things that have to be addressed.

  Mr Ryley: I would just like to confirm that. I think that is absolutely right. I think it is an urgent area to look at. I think in Hull, although our flood defences were certainly an asset on this occasion, we came close to losing key pieces of infrastructure, closer than we were happy with even then, and we were not convinced that there was the same extent of business continuity planning and even the same attitude towards the protection of those assets, which were perhaps influenced more by commercial consideration, if you like, than actually their usefulness in maintaining public order.

  Sir Robert Kerslake: It is worth saying that you have a complexity of arrangements, here. You have the National Grid and the series of companies and they may not necessarily know themselves where all their problems are, and that was one of the key issues, John, that we had to tackle, was it not?

  Mr Charlton: Yes. There was a gantry bridge that spanned the River Don and it acted like a beaver dam, there were trees and debris blocked there, and gas, water and electricity was suspended underneath. It took us quite a while to get someone of sufficient seniority and technical expertise to tell us whether those were live or dead. Eventually we found out they were not and removed the bridge. The danger was that it would sweep downstream where there was another bridge that was taking live cables, and that would have cut half of Sheffield off from electricity; but fortunately the beaver dam did not break and it did not destroy the bridge further down, but it could have done and it could have been because of indecision by the utilities on site that particular day who could not tell us immediately whether they were live or dead.

  Professor Coulthard: I think there is an issue in devolving responsibility to the respective utilities to manage their own flood risk in that respect. You split the problem up. Only if, say, for example, an electricity company suddenly realises one of its sub-stations is in real danger will it get in touch possibly with Silver or Gold Command and say, "We have got a real problem here and we need it." By then, I suspect, it might well be too late. Certainly one of the issues we found and that Yorkshire Water mentioned to us with the pumping situation, obviously were not allowed is the wrong word, but they found they were not a part of Silver Command until fairly late on the process, and they are critical. Hence, the emergency services did not actually know that there were three pumping stations in Hull that were critical to Hull remaining dry, or drier, and, when I pointed them out on a map, they were quite surprised to find they were there, and their failure, if that had happened, would have had such severe consequences. There is this issue of the utilities. By being split up they do not have the same sort of centralised strategy for dealing with this.

  Q233  Chairman: Dams and reservoirs. You had the Ulley Dam, which I think dominated people's concerns when the television coverage of what was happening in Sheffield was on, but it has raised the rather more serious and wider spread issue, as your own evidence in paragraph 4.5.6 talks about. You said in your evidence in the issues raised that there should be clarity and responsibility for dam and reservoir over-topping plans, and you asked the very pertinent question: who has the statutory duty to warn and inform? I was at a seminar last week organised by a company called Logico and a gentleman there was saying that many of these dams go back 120 years. It is not clear who is responsible for them, and he said that there were not systems in place for monitoring them, either from the point of view of their ability to hold back water or physically what might be happening to them. I felt under threat at that point. What would you like to say from the Sheffield standpoint?

  Mr Charlton: Within the Sheffield boundary there are 20 reservoirs, dams, and 19 of those are owned and managed by Yorkshire Water. I understand you are talking to them later. I think it might be better if you let them speak on that. The one dam that we are responsible for is a very small dam. It is checked every six months. It was checked in April of this year before the flood, it was checked at seven on the morning after the flood and there was not any safety issue to deal with. We do those checks. I understand other authorities who have got dams should be doing those checks under the Reservoirs Act, and I assume Yorkshire Water is doing the same, but in terms of—

  Q234  Chairman: Let me pick you up on a bit of language there. "I assume that Yorkshire Water is doing the same." One of the points you raised, which is why I read it out from your evidence, seemed to be that you were worried actually whose responsibility it was to advise if there were problems with dams, and you have now told us that within your area, within the city's boundaries, you have got, if you like, a major risk in terms of these dams if something went wrong. Have you ever had as a city councillor a conversation with Yorkshire Water about what they do about dams?

  Mr Charlton: I have not personally. I understand members of staff within Sheffield City Council—the land drainage engineer has regular contact with Yorkshire Water. I think the uncertainty is about who raises the alarm in terms of warnings. I think that is the issue. That is unclear. I am not sure there is a system in place for actually doing that. There is a system in place for severe flood warnings, flood warnings and flood watches issued by the Environment Agency for river flooding, but I do not think one exists for reservoirs, to the best of my knowledge.

  Sir Robert Kerslake: I think our particular concern that led to that comment was the Ulley Dam. If you think about the situation here, the Ulley Dam is essentially recreational, the reservoir is a recreational reservoir, it serves no purpose other than for recreation now, and yet at one point we were under an impression that, had this dam broken, it would have taken out the M1 and taken out the power station and Sheffield would have been without power for a week. If you think about the consequences of that, you can see that there must be some system of assurance here about these dams.

  Q235  Chairman: Who off the record is responsible for this dam?

  Sir Robert Kerslake: In that instance it is Rotherham.

  Q236  Chairman: Rotherham. So the City Council of Rotherham is responsible. It is their dam.

  Councillor Wilson: Yes.

  Q237  Chairman: You do not talk your next-door neighbour about their dam?

  Sir Robert Kerslake: We absolutely do talk to them plenty of times, but I think the issue we are trying to describe here is the risk assessment of the consequences of the failure. I do not think anybody had thought that if this damn collapsed it might have the kind of impact that it would have had, and it is that risk assessment.

  Q238  Chairman: Going back to your own strategic flood risk assessment, when you were doing that exercise was the question of dams incorporated in the work you were doing there?

  Mr Charlton: Yes.

  Chairman: It was. Okay; Roger.

  Q239  Mr Williams: Do you know from any particular reservoir owner whether they actually insure against consequential loss if there was a failure or an over-topping?

  Sir Robert Kerslake: It is a good question. I do not know is the short answer.

  Q240  Mr Williams: Is there any requirement under the Reservoir Act for that?

  Mr Charlton: I simply do not know.

  Sir Robert Kerslake: I do not know.

  Chairman: Thank you very much indeed. You have certainly added some useful colour to the very helpful written evidence which you have kindly put to us. We always comment that if on the train on the way home you suddenly think, "Wow, there was something I forgot to tell them", the door is still open for us to be told, but thank you very much for coming to talk to us today. Obviously we will reflect very carefully on what you have had to say when we come to produce our report.





 